Optimization Models in Software Reliability

2022 ◽  
1990 ◽  
Vol 5 (1) ◽  
pp. 2
Author(s):  
Barbara Kitchenham
Keyword(s):  

In the article, the author considers the problems of complex algorithmization and systematization of approaches to optimizing the work plans of construction organizations (calendar plans) using various modern tools, including, for example, evolutionary algorithms for "conscious" enumeration of options for solving a target function from an array of possible constraints for a given nomenclature. Various typical schemes for modeling the processes of distribution of labor resources between objects of the production program are given, taking into account the array of source data. This data includes the possibility of using the material and technical supply base (delivery, storage, packaging) as a temporary container for placing the labor resource in case of released capacity, quantitative and qualification composition of the initial labor resource, the properties of the construction organization as a counterparty in the contract system with the customer of construction and installation works etc. A conceptual algorithm is formed that is the basis of the software package for operational harmonization of the production program ( work plans) in accordance with the loading of production units, the released capacities of labor resources and other conditions stipulated by the model. The application of the proposed algorithm is most convenient for a set of objects, which determines the relevance of its implementation in optimization models when planning production programs of building organizations that contain several objects distributed over a time scale.


Sign in / Sign up

Export Citation Format

Share Document