Integrated Workforce Scheduling and Flexible Flow Shop Problem in the Meat Industry

2021 ◽  
pp. 594-602
Author(s):  
Beatrice Bolsi ◽  
Vinícius Loti de Lima ◽  
Thiago Alves de Queiroz ◽  
Manuel Iori
2011 ◽  
Vol 101-102 ◽  
pp. 783-789
Author(s):  
Zhan Tao Li ◽  
Qing Xin Chen ◽  
Ning Mao

Rapid access (RA) is an effective heuristic method for solving the permutation flow shop problem with the objective of makespan. This paper proposes a heuristic IRA (i.e., improved RA) for the two-stage flexible flow shop scheduling problem with head group constraint. In the heuristic IRA, two dispatch rules, i.e., earliest completion time first (ECT)) and earliest start time first (EST), are proposed for allocating devices for tasks. Benchmark testing results show that using ECT dispatch rule can significantly improve the performance of heuristic IRA. As comparison, the heuristic CDS and heuristic Palmer have also simulated under the same conditions, and the results show that the IRA is able to provide much better performance.


2015 ◽  
Vol 42 (7) ◽  
pp. 3571-3584 ◽  
Author(s):  
Zhan-tao Li ◽  
Jianjun Liu ◽  
Qing-xin Chen ◽  
Ning Mao ◽  
Xiaoming Wang

2011 ◽  
Vol 31 (3) ◽  
pp. 443-457 ◽  
Author(s):  
Lorena Pradenas ◽  
Abel Campos ◽  
Jesús Saldaña ◽  
Victor Parada

Sign in / Sign up

Export Citation Format

Share Document