Optimal Work-in-Process Control for a Closed Multistage Production System with Machine Preference
2021 ◽
Vol 55
(5)
◽
pp. 210-218
Analysis of Production Scheduling : Optimization of Group Scheduling on Multistage Production System
1976 ◽
Vol 42
(361)
◽
pp. 2964-2975
◽
1978 ◽
Vol 44
(387)
◽
pp. 3993-4002
1976 ◽
Vol 14
(2)
◽
pp. 199-213
◽
1993 ◽
Vol 30-31
◽
pp. 153-166
◽
1975 ◽
Vol 41
(348)
◽
pp. 2500-2510
Keyword(s):
1990 ◽
Vol 19
(1-3)
◽
pp. 287-294
◽