scholarly journals Analysis of Production Scheduling : Optimization of Group Scheduling on Multistage Production System

1976 ◽  
Vol 42 (361) ◽  
pp. 2964-2975 ◽  
Author(s):  
Nobuto NAKAMURA ◽  
Katsundo HITOMI
2021 ◽  
Vol 1 (2) ◽  
pp. 46-51
Author(s):  
Dwi Ayu Lestari, Vikha Indira Asri

Scheduling is defined as the process of sequencing the manufacture of a product as a whole on several machines. All industries need proper scheduling to manage the allocation of resources so that the production system can run quickly and precisely as of it can produce optimal product. PT. Sari Warna Asli Unit V is one of the companies that implements a make to order production system with the FCFS system. Thus, scheduling the production process at this company is also known as job shop production scheduling. The methods used in this research are the CDS method, the EDD method and the FCFS method. The purpose of this research is to minimize the production time and determine the best method that can be applied to the company. The results of this research showed that the makespan obtained in the company's scheduling system with FCFS rules was 458 minutes, and the results of scheduling using the CDS method obtained a makespan value of 329 minutes, then the best production scheduling method that had the smallest makespan value was the CDS method.


Sign in / Sign up

Export Citation Format

Share Document