Feasibility Study on the Implementation of Energy Recovery Tunnel Segmental Lining in the Lot 3 Tunnel on Railway Line 16 of the Grand Paris Express
Keyword(s):
2018 ◽
Vol 40
(24)
◽
pp. 2914-2922
◽
2012 ◽
Vol 39
◽
pp. 53-62
◽
Keyword(s):
2015 ◽
Vol 297
◽
pp. 320-328
◽