Different Codifications and Metaheuristic Algorithms for the Resource Renting Problem with Minimum and Maximum Time Lags

Author(s):  
Francisco Ballestín
2005 ◽  
Vol 22 (03) ◽  
pp. 377-390 ◽  
Author(s):  
J. L. CORNER ◽  
L. R. FOULDS

We discuss the harvesting of a single forest block from an operations scheduling viewpoint. We report on a harvesting case study, based on practical data from a commercial enterprise, involving minimum and maximum time lags and resource constraints. It appears that the scheduling of the harvesting forest blocks is a significantly different scenario from those represented by the scheduling models available in the literature. The differences come about because: the duration of each operation is dependent upon the combination of constrained resources allocated to it, individual worker-equipment allocation is restricted, and minimum or maximum time lags can be imposed. We report on harvesting operations, a scheduling model, and solution procedures, designed specifically for the case study.


Sign in / Sign up

Export Citation Format

Share Document