Quantitative Fire Risk Assessment Procedure at Pesticide Storage Facilities in Romania

Author(s):  
Lucrina Ştefănescu ◽  
Török Zoltan ◽  
Francisc Senzaconi ◽  
Alexandru Ozunu
2014 ◽  
Vol 1025-1026 ◽  
pp. 854-857 ◽  
Author(s):  
Chan Jeoung ◽  
Woo Seok Kim ◽  
Heung Bae Gil ◽  
Il Keun Lee ◽  
Sung Hwan Yun

Fire event is the one of most severe event on the bridge. Fire event on the bridge has been reported annual average 8 cases in South Korea. Especially Bucheon viaduct fire cause catastrophic damage on the traffic system. This study developed and conducted fire risk assessment for existing bridge on the highway. Entire risk assessment procedure divided into 3 sections, PRA, SRA and DRA. PRA check fire scenario possibility. SRA check key parameter of fire risk by checklist. DRA is a precision risk assessment and find what part makes bridge high risk.


2020 ◽  
Vol 13 (5) ◽  
pp. 182
Author(s):  
Stanislav Szabo ◽  
Iveta Vajdova ◽  
Edina Jencova ◽  
Daniel Blasko ◽  
Robert Rozenberg ◽  
...  

2008 ◽  
Vol 18 (1) ◽  
pp. 61-77
Author(s):  
Jen-Hao Chi ◽  
Cheng-Tung Chen ◽  
Jia-Woei Chen

2021 ◽  
pp. 100104
Author(s):  
Nadège CIREZI CIZUNGU ◽  
Elvis TSHIBASU ◽  
Eric LUTETE ◽  
Arsene MUSHAGALUSA ◽  
Yannick MUGUMAARHAHAMA ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document