An integrated planning and control system for scheduling in flexible manufacturing systems
1994 ◽
pp. 142-168
1988 ◽
Vol 3
(1)
◽
pp. 15-32
◽
2005 ◽
2005 ◽
pp. 843-851
◽
2011 ◽
Vol 59
(9-12)
◽
pp. 1127-1142
◽
2011 ◽
Vol 317-319
◽
pp. 552-555
Celeritas: a coloured Petri net approach to simulation and control of flexible manufacturing systems
1992 ◽
Vol 30
(8)
◽
pp. 1925-1956
◽