TS-Preemption Threshold and Priority Optimization for the Process Scheduling in Integrated Modular Avionics

Author(s):  
Qianlin Zhou ◽  
Hui Lu ◽  
Honglei Qin ◽  
Jinhua Shi ◽  
Rongrong Zhou
1988 ◽  
Vol 23 (3) ◽  
pp. 7-12 ◽  
Author(s):  
David Hemmendinger
Keyword(s):  

2014 ◽  
Vol 602-605 ◽  
pp. 571-574
Author(s):  
Mao Liu

In the construction process of large-scale civil engineering and architecture, how to realize rational scheduling is a key problem need to be solved. This paper studies the construction process of the large-scale Civil Engineering decoration companies, particularly the construction with parallel multiple sets of team and multi-project. To solve the problem, the paper designs a special scheduling algorithm and carries out simulation. The scheduling algorithm shorts the duration of construction and improves enterprise efficiency.


2012 ◽  
Vol 5 (1) ◽  
pp. 245-255 ◽  
Author(s):  
Thierry LeSergent ◽  
Frederic Romeas ◽  
Olivier TOURILLION

1997 ◽  
Vol 36 (2) ◽  
pp. 81-121 ◽  
Author(s):  
G. Applequist ◽  
O. Samikoglu ◽  
J. Pekny ◽  
G. Reklaitis

Sign in / Sign up

Export Citation Format

Share Document