An Online Pre-decision Method for Security and Stability of Frequency and Voltage Emergency Regulation in AC/DC Power System

Author(s):  
Qinfeng Ma ◽  
Xiaotong Xu ◽  
Mingshun Liu ◽  
Feng Wu ◽  
Guosong Wang ◽  
...  
2015 ◽  
Vol 510 ◽  
pp. 48-53 ◽  
Author(s):  
Jian Xun Jin ◽  
Xiao Yuan Chen ◽  
Ronghai Qu ◽  
Hai Yang Fang ◽  
Ying Xin

Author(s):  
Xiangqiang Liu ◽  
Huifan Xie ◽  
Haijun Wang ◽  
Zhaoshuo Wang ◽  
Jinzhuang Lv
Keyword(s):  

2018 ◽  
Vol 88-90 ◽  
pp. 1201-1205 ◽  
Author(s):  
Ji Shu ◽  
Shunliang Wang ◽  
Tianqi Liu ◽  
Ning Jiao ◽  
Yanbo Wang

Author(s):  
L. Michi ◽  
G. Donnini ◽  
B. Aluisio ◽  
M. Migliori ◽  
C. Vergine ◽  
...  

2018 ◽  
Vol 38 ◽  
pp. 04010
Author(s):  
Xiaojing Hu ◽  
Qiang Li ◽  
Hao Zhang ◽  
Ziming Guo ◽  
Kun Zhao ◽  
...  

Based on the Monte Carlo method, an improved risk assessment method for hybrid AC/DC power system with VSC station considering the operation status of generators, converter stations, AC lines and DC lines is proposed. According to the sequential AC/DC power flow algorithm, node voltage and line active power are solved, and then the operation risk indices of node voltage over-limit and line active power over-limit are calculated. Finally, an improved two-area IEEE RTS-96 system is taken as a case to analyze and assessment its operation risk. The results show that the proposed model and method can intuitively and directly reflect the weak nodes and weak lines of the system, which can provide some reference for the dispatching department.


Sign in / Sign up

Export Citation Format

Share Document