Risk Assessment of Public-Private Partnership Projects

Author(s):  
Robert Osei-Kyei ◽  
Albert P. C. Chan
2019 ◽  
Vol 25 (2) ◽  
pp. 168-183 ◽  
Author(s):  
Yan Li ◽  
Xinyu Wang

The public-private partnership (PPP) has been adopted globally to meet intensifying demands for public facilities and services. However, PPP projects contain a variety of risks which may lead to project failure. Many researchers have explored risk factors associated with PPP projects in developing countries. However, these investigations have limited their aim to understanding risk impact without considering the interactions of these factors. Hence, to fill this gap, this study proposes a risk assessment method, addressing vital interrelationships and interdependencies. Two methodologies, fuzzy analytic network process (F-ANP) and interpretive structural modeling (ISM), were applied to avoid vagueness and data inaccuracies. The primary contributions of this paper were considering the relationships among risk factors and risk priority; and offering a risk analysis approach based on linguistic scales and fuzzy numbers to reflect different neutral, optimistic and pessimistic viewpoints from expert respondents’ judgments. Results from this analysis showed that legal and policy risk was the most influential and interdependent risk, and interest rate risk was the most essential risk in Chinese PPP projects. The ISM structure diagram demonstrated that most of 35 identified risk factors had high driving and dependence power. This study proposed a systematic and practical method to identify and assess PPP risk factors, utilizing an integrated approach consisting of F-ANP and ISM, which has not been used for risk assessment in the construction field. This paper provides a new risk assessment tool and a basis for risk management strategies in the construction engineering and management field.


Author(s):  
Maram Almuhisen ◽  
◽  
Hüseyin Gökçekuş ◽  
Tahir Çelik ◽  
◽  
...  

For the Jordanian government, meeting the growing demand for goods and services on its own is very difficult, leading to the increased dependence on other sectors of society. This research is aimed at understanding the critical success factors of local public-private partnership projects, identifying the most vital risk factors affecting projects, and establishing a quantitative model for risk assessment. The model can assist public-private partnership contributors by transforming the basic risk assessment principles into a more facilitated and systematic arithmetical based approach. The results showed that the risk factors with the highest ranks (respectively) are transfer phase, organizational risks, financing phase, project management risks, and feasibility study phase. The research is ultimately aimed at developing a framework for the risk evaluation of public-private partnerships within the construction industry in Jordan.


2011 ◽  
Vol 27 (3) ◽  
pp. 136-148 ◽  
Author(s):  
Albert P. C. Chan ◽  
John F. Y. Yeung ◽  
Calvin C. P. Yu ◽  
Shou Qing Wang ◽  
Yongjian Ke

Sign in / Sign up

Export Citation Format

Share Document