Applying simulated annealing to location-planning models

1996 ◽  
Vol 2 (1) ◽  
pp. 31-53 ◽  
Author(s):  
Alan T. Murray ◽  
Richard L. Church
2011 ◽  
Vol 2011 ◽  
pp. 1-18 ◽  
Author(s):  
Muhammad Al-Salamah

The aim of this paper is to introduce a model for temporary staffing when temporary employment is managed by firm contracts and to propose a simulated annealing-based method to solve the model. Temporary employment is a policy frequently used to adjust the working hour capacity to fluctuating demand. Temporary workforce planning models have been unnecessarily simplified to account for only periodic hiring and laying off; a company can review its workforce requirement every period and make hire-fire decisions accordingly, usually with a layoff cost. We present a more realistic temporary workforce planning model that assumes a firm contract between the worker and the company, which can extend to several periods. The model assumes the traditional constraints, such as inventory balance constraints, worker availability, and labor hour mix. The costs are the inventory holding cost, training cost of the temporary workers, and the backorder cost. The mixed integer model developed for this case has been found to be difficult to solve even for small problem sizes; therefore, a simulated annealing algorithm is proposed to solve the mixed integer model. The performance of the SA algorithm is compared with the CPLEX solution.


Author(s):  
Rosnani Ginting ◽  
Chairul Rahmadsyah Manik

Penjadwalan merupakan aspek yang sangat penting karena didalamnya terdapat elemen perencanaan dan pengendalian produksi bagi suatu perusahaan yang dapat mengirim barang sesuai dengan waktu yang telah ditentukan, untuk memperoleh waktu total penyelesaian yang minimum. Masalah utama yang dihadapi oleh PT. ML adalah keterlambatan penyelesaian order yang mempengaruhi delivery time ke tangan costumer karena pelaksanaan penjadwalan produksi dilantai pabrik belum menghasilkan makespan yang sesuai dengan order yang ada. Oleh kaena itu dituntut untuk mencari solusi pemecahan masalah optimal dalam penentuan jadwal produksi untuk meminimisasi total waktu penyelessaian (makespan) semua order. Dalam penelitian ini, penjadwalan menggunakan metode Simulated Annealing (SA) diharapkan dapat menghasilkan waktu total penyelesaian lebih cepat dari penjadwalan yang ada pada perusahaan.   Scheduling is a very important aspect because in it there are elements of planning and production control for a company that can send goods in accordance with a predetermined time, to obtain a minimum total time of completion. The main problem faced by PT. ML is the delay in completing orders that affect delivery time to customer because the implementation of production scheduling on the factory floor has not produced the makespan that matches the existing order. Therefore, it is required to find optimal problem solving solutions in determining the production schedule to minimize the total time of elimination (makespan) of all orders. In this study, scheduling using the Simulated Annealing (SA) method is expected to produce a total time of completion faster than the existing scheduling in the company.


2013 ◽  
Author(s):  
Artchapong Hassametto ◽  
Preerawadee Chaiboontun ◽  
Chattraporn Prajuabwan ◽  
Laphatrada Khammuang ◽  
Aussadavut Dumrongsiri

Sign in / Sign up

Export Citation Format

Share Document