Flexible manufacturing system (FMS) scheduling using filtered beam search

1990 ◽  
Vol 1 (3) ◽  
pp. 165-183 ◽  
Author(s):  
Suranjan De ◽  
Anita Lee
2011 ◽  
Vol 121-126 ◽  
pp. 1630-1635
Author(s):  
Nai Fei Ren ◽  
Yan Zhao ◽  
Jun Zhang

Aiming at solving scheduling problem of flexible manufacturing system, this paper puts forward a FMS scheduling problem where single AGV with two buffers system is to be considered. Such an AGV with two buffers system was replaced with double-buffer AGV system in the next content. To solve FMS scheduling problem with double-buffer AGV system, a mathematical model which integrated double-buffer AGV and jobs was designed. And an improved genetic algorithm is proposed to sequence processing of jobs and the moving path of double-buffer AGV. The experiments made in simulation FMS production line laboratory realized scheduling integration of jobs and AGV, meanwhile, experiments gained processing sequence of jobs on each machine and moving path of AGV. Contrasting results of double-buffer and no-buffer AGV system verified double-buffer AGV system has higher feasibility and effectiveness.


2009 ◽  
Vol 25 (03) ◽  
pp. 168-173
Author(s):  
Ji Wang ◽  
Yujun Liu ◽  
Zhuoshang Ji ◽  
Yanping Deng ◽  
Yuanyuan Zheng

The hull job shop in a shipyard is a typical flexible manufacturing system (FMS), the flexibility and efficiency of which largely depends on the level of FMS scheduling. In this paper, the Object-Oriented Colored Petri Net (OOCPN) is used to build the FMS model for the hull job shop. A four-step modeling method of FMS has been developed to successfully simulate the scheduling of the hull job shop.


2021 ◽  
Vol 60 ◽  
pp. 176-201
Author(s):  
Yepeng Fan ◽  
Jianzhong Yang ◽  
Jihong Chen ◽  
Pengcheng Hu ◽  
Xiaoyu Wang ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document