Earthcore-rockfill dam at the run-of-river unit no. 1 of the Ingursk hydroelectric power system

1970 ◽  
Vol 4 (10) ◽  
pp. 896-899
Author(s):  
R. A. Airapetyan
2020 ◽  
Vol 209 ◽  
pp. 07014
Author(s):  
Tulkin Gayibov ◽  
Bekzod Pulatov

Optimal planning of short-term modes of power systems is a complex nonlinear programming problem with many simple, functional and integral constraints in the form of equalities and inequalities. Especially, the presence of integral constraints causes significant difficulties in solving of such problem. Since, under such constraints, the modes of power system in separate time intervals of the considered planning period become dependent on the values of the parameters in other intervals. Accordingly, it becomes impossible to obtain the optimal mode plan as the results of separate optimization for individual time intervals of the period under consideration. And the simultaneous solution of the problem for all time intervals of the planning period in the conditions of large power systems is associated with additional difficulties in ensuring the reliability of convergence of the iterative computational process. In this regard, the issues of improving the methods and algorithms for optimization of short-term modes of power systems containing thermal and large hydroelectric power plants with reservoirs, in which water consumption is regulated in the short-term planning period, remains as an important task. In this paper, we propose the effective algorithm for solving the problem under consideration, which makes it possible to quickly and reliably determine the optimal operating modes of the power system for the planned period. The results of research of effectiveness of this algorithm are presented on the example of optimal planning of daily mode of the power system, which contains two thermal and three hydraulic power plants..


2015 ◽  
Vol 5 (4) ◽  
pp. 86-92 ◽  
Author(s):  
Mikhail Ivanovich BALZANNIKOV

Considered run-of-river hydropower plants (HPP). Notes the importance of technical-economic calculations in the justifi cation of large water-conducting elements of the path these types of HPP. The methodology of economic substantiation of the expediency of increasing the length of the draft tube. Using the technique of the calculations for lowpressure hydroelectric run-of-river type. The results of the analysis of the influence of the operating conditions of the hydroelectric power station on basic geometrical parameters of draft tube.


2011 ◽  
Vol 36 (11) ◽  
pp. 2799-2808 ◽  
Author(s):  
Andrew Pascale ◽  
Tania Urmee ◽  
Andrew Moore

Sign in / Sign up

Export Citation Format

Share Document