scholarly journals Semi-on-line scheduling problems for maximizing the minimum machine completion time

2001 ◽  
Vol 17 (1) ◽  
pp. 107-113 ◽  
Author(s):  
He Yong
Algorithms ◽  
2019 ◽  
Vol 13 (1) ◽  
pp. 4 ◽  
Author(s):  
Yuri N. Sotskov ◽  
Natalja M. Matsveichuk ◽  
Vadzim D. Hatsura

We study two-machine shop-scheduling problems provided that lower and upper bounds on durations of n jobs are given before scheduling. An exact value of the job duration remains unknown until completing the job. The objective is to minimize the makespan (schedule length). We address the issue of how to best execute a schedule if the job duration may take any real value from the given segment. Scheduling decisions may consist of two phases: an off-line phase and an on-line phase. Using information on the lower and upper bounds for each job duration available at the off-line phase, a scheduler can determine a minimal dominant set of schedules (DS) based on sufficient conditions for schedule domination. The DS optimally covers all possible realizations (scenarios) of the uncertain job durations in the sense that, for each possible scenario, there exists at least one schedule in the DS which is optimal. The DS enables a scheduler to quickly make an on-line scheduling decision whenever additional information on completing jobs is available. A scheduler can choose a schedule which is optimal for the most possible scenarios. We developed algorithms for testing a set of conditions for a schedule dominance. These algorithms are polynomial in the number of jobs. Their time complexity does not exceed O ( n 2 ) . Computational experiments have shown the effectiveness of the developed algorithms. If there were no more than 600 jobs, then all 1000 instances in each tested series were solved in one second at most. An instance with 10,000 jobs was solved in 0.4 s on average. The most instances from nine tested classes were optimally solved. If the maximum relative error of the job duration was not greater than 20 % , then more than 80 % of the tested instances were optimally solved. If the maximum relative error was equal to 50 % , then 45 % of the tested instances from the nine classes were optimally solved.


2020 ◽  
Vol 2020 ◽  
pp. 1-8
Author(s):  
Li Sun ◽  
Lei Ning ◽  
Jia-zhen Huo

In this paper, we introduce a group scheduling model with time-dependent and position-dependent DeJong’s learning effect. The objectives of scheduling problems are to minimize makespan, the total completion time, and the total weighted completion time, respectively. We show that the problems remain solvable in polynomial time under the proposed model.


2007 ◽  
Vol 24 (02) ◽  
pp. 245-261 ◽  
Author(s):  
JI-BO WANG ◽  
T. C. EDWIN CHENG

This paper deals with the machine scheduling problems with the effects of deterioration and learning. In this model the processing times of jobs are defined as functions of their starting times and positions in a sequence. We introduce polynomial solutions for some single machine problems and flow shop problems. The performance measures include makespan, total completion time, total weighted completion time, and maximum lateness.


2019 ◽  
Vol 9 (2) ◽  
pp. 20-38
Author(s):  
Harendra Kumar ◽  
Pankaj Kumar ◽  
Manisha Sharma

Flow shop scheduling problems have been analyzed worldwide due to their various applications in industry. In this article, a new genetic algorithm (NGA) is developed to obtain the optimum schedule for the minimization of total completion time of n-jobs in an m-machine flow shop operating without buffers. The working process of the present algorithm is very efficient to implement and effective to find the best results. To implement the proposed algorithm more effectively, similar job order crossover operators and inversion mutation operators have been used. Numerous examples are illustrated to explain proposed approach. Finally, the computational results indicate that present NGA performs much superior to the heuristics for blocking flow shop developed in the literature.


2020 ◽  
Vol 2020 ◽  
pp. 1-6 ◽  
Author(s):  
Chia-Lun Hsu ◽  
Jan-Ray Liao

The objective of this paper is to minimize both the makespan and the total completion time. Since parallel-machine scheduling which contains the function constraint problem has been a new issue, this paper explored two parallel-machine scheduling problems with function constraint, which refers to the situation that the two machines have a same function but one of the machines has another. We pointed out that the function constraint occurs not only in the manufacturing system but also in the service system. For the makespan problem, we demonstrated that it is NP-hard in the ordinary sense. In addition, we presented a polynomial time heuristic for this problem and have proved its worst-case ratio is not greater than 5/4. Furthermore, we simulated the performance of the algorithm through computational testing. The overall mean percent error of the heuristic is 0.0565%. The results revealed that the proposed algorithm is quite efficient. For the total completion time problem, we have proved that it can be solved in On4 time.


Author(s):  
PENG-JEN LAI ◽  
HSIEN-CHUNG WU

The flow shop scheduling problems with fuzzy processing times are investigated in this paper. For some special kinds of fuzzy numbers, the analytic formulas of the fuzzy compltion time can be obtained. For the general bell-shaped fuzzy numbers, we present a computational procedure to obtain the approximated membership function of the fuzzy completion time. We define a defuzzification function to rank the fuzzy numbers. Under this ranking concept among fuzzy numbers, we plan to minimize the fuzzy makespan and total weighted fuzzy completion time. Because the ant colony algorithm has been successfully used to solve the scheduling problems with real-valued processing times, we shall also apply the ant colony algorithm to search for the best schedules when the processing times are assumed as fuzzy numbers. Numerical examples are also provided and solved by using the commercial software MATLAB.


Sign in / Sign up

Export Citation Format

Share Document