Minimization of total tardiness on unrelated parallel machines with sequence- and machine-dependent setup times under due date constraints

2010 ◽  
Vol 53 (1-4) ◽  
pp. 353-361 ◽  
Author(s):  
Shih-Wei Lin ◽  
Chung-Cheng Lu ◽  
Kuo-Ching Ying
2008 ◽  
Vol 35 (4) ◽  
pp. 1250-1264 ◽  
Author(s):  
Pedro Leite Rocha ◽  
Martín Gómez Ravetti ◽  
Geraldo Robson Mateus ◽  
Panos M. Pardalos

2022 ◽  
Vol 13 (2) ◽  
pp. 223-236 ◽  
Author(s):  
Massimo Pinto Antonioli ◽  
Carlos Diego Rodrigues ◽  
Bruno de Athayde Prata

This paper aims at presenting a customer order scheduling environment in which the setup times are explicit and depend on the production sequence. The considered objective function is the total tardiness minimization. Since the variant under study is NP-hard, we propose a mixed-integer linear programming (MILP) model, an adaptation of the Order-Scheduling Modified Due-Date heuristic (OMDD) (referred to as Order-Scheduling Modified Due-Date Setup (OMMD-S)), an adaptation of the Framinan and Perez-Gonzalez heuristic (FP) (hereinafter referred to as Framinan and Perez-Gonzalez Setup (FP-S)), a matheuristic with Same Permutation in All Machines (SPAM), and the hybrid matheuristic SPAM-SJPO based on Job-Position Oscillation (JPO). The algorithms under comparison have been compared on an extensive benchmark of randomly generated test instances, considering two performance measures: Relative Deviation Index (RDI) and Success Rate (SR). For the small-size evaluated instances, the SPAM is the most efficient algorithm, presenting the better values of RDI and SR. For the large-size evaluated instances, the hybrid matheuristic SPAM-JPO and MILP model are the most efficient methods.


Sign in / Sign up

Export Citation Format

Share Document