A rough-cut capacity planning model with overlapping

OR Spectrum ◽  
2016 ◽  
Vol 38 (2) ◽  
pp. 335-364 ◽  
Author(s):  
Georges Baydoun ◽  
Alain Haït ◽  
Robert Pellerin ◽  
Bernard Clément ◽  
Guillaume Bouvignies
2018 ◽  
Vol 8 (2) ◽  
pp. 91
Author(s):  
Iksan Iksan

Production capacity planning this company have obstacle in meeting its production target, then company oftentimes unable to fulfill consumer demands. It can be inflict the company loose. The problems is how planning production capacity based on Rough Cut Capacity Planning (RCCP) Method in order to make consumers demand be able to supplied? “ The researcher attempt to resolving problem in PT Muncul Abadi by aiming calculate product capacity plan based on Rough Cut Capacity Planning Method and determine required product. To be useful as consideration for the company in planning production. Forecast done within the coming one year term. Capacity planning base on Rough Cut Capacity Planning (RCCP) Method. From forecast result toward previous demand quantity period within 12 periods we could be make production index schedule and order Bill of Resources with standard time that is 0,000316 hours/kg. Able to know machine capacity need in 1 workday = 8 hours day, with 3 shifts per day, 1 week = 6 workdays, 1 month = 25 effective workdays then : available time per month = 25 effective workdays x 8 hours day x 3 shift per day = 600 hours/month. Available capacity for Washing machine = 1.394 hours/month. Available capacity for Crushing machine = 1.394 hours/month. Available capacity for Pelletizing machine = 1.859 hours/month.


Energies ◽  
2020 ◽  
Vol 13 (14) ◽  
pp. 3602
Author(s):  
Yurong Wang ◽  
Ruolin Yang ◽  
Sixuan Xu ◽  
Yi Tang

Distributed wind power (DWP) needs to be consumed locally under a 110 kV network without reverse power flow in China. To maximize the use of DWP, this paper proposes a novel method for capacity planning of DWP with participation of the energy storage system (ESS) in multiple scenarios by means of a variable-structure copula and optimization theory. First, wind power and local load are predicted at the planning stage by an autoregressive moving average (ARMA) model, then, variable-structure copula models are established based on different time segment strategies to depict the correlation of DWP and load, and the joint typical scenarios of DWP and load are generated by clustering, and a capacity planning model of DWP is proposed considering investment and operation cost, and environmental benefit and line loss cost under typical scenario conditions. Moreover, a collaborative capacity planning model for DWP and ESS is prospectively proposed. Based on the modified IEEE-33 bus system, the results of the case study show that the DWP capacity result is more reasonable after considering the correlation of wind and load by using a variable-structure copula. With consideration of the collaborative planning of DWP and load, the consumption of DWP is further improved, the annual cost of the system is more economical, and the quality of voltage is effectively improved. The study results validate the proposed method and provide effective reference for the planning strategy of DWP.


2006 ◽  
Vol 53 (2) ◽  
pp. 137-150 ◽  
Author(s):  
Woonghee Tim Huh ◽  
Robin O. Roundy ◽  
Metin Çakanyildirim

Sign in / Sign up

Export Citation Format

Share Document