A cyclic production scheme for the synchronized and integrated two-level lot-sizing and scheduling problem with no-wait restrictions and stochastic demand

OR Spectrum ◽  
2019 ◽  
Vol 41 (4) ◽  
pp. 895-942 ◽  
Author(s):  
Dirk Briskorn ◽  
Philipp Zeise
2020 ◽  
Vol 284 (3) ◽  
pp. 861-873 ◽  
Author(s):  
Yasmín Á Ríos-Solís ◽  
Omar J. Ibarra-Rojas ◽  
Marta Cabo ◽  
Edgar Possani

Sign in / Sign up

Export Citation Format

Share Document