Seismic prediction method of multiscale fractured reservoir

2018 ◽  
Vol 15 (2) ◽  
pp. 240-252 ◽  
Author(s):  
Ling-Ling Wang ◽  
Jian-Xin Wei ◽  
Ping Huang ◽  
Bang-Rang Di ◽  
Fu-Hong Zhang
2014 ◽  
Author(s):  
Guo Xuguang ◽  
Lei Dewen ◽  
Wang Xiatian ◽  
Zhou Kequan ◽  
Zhao Long

2012 ◽  
Vol 594-597 ◽  
pp. 1294-1297 ◽  
Author(s):  
Yajie Jia ◽  
Ya Lin Li ◽  
Liang Huo

A kind of geological disasters such as fault and water gushing often occurs during the informational construction of deep super long tunnel, which brings momentous disaster and economic loss to construction safety, so the precise and immediate advance forecast to the situation of fault and water gushing has an important theoretical significance and practical value. The theory of geological survey method, TSP(tunnel seismic prediction) method and GPR(ground penetrating radar) method are summarized and analyzed, forecast geological prediction process for fault and water gushing in deep-buried super long tunnel is formulated with the combination of the three methods. Then a deep super long road tunnel named Da Xiang Ling is detected by using the process synthetically, which gains good prediction results. It has a certain guiding significance to similar projects.


2017 ◽  
Vol 44 (4) ◽  
pp. 544-551 ◽  
Author(s):  
Hua YANG ◽  
Daxing WANG ◽  
Mengbo ZHANG ◽  
Yonggang WANG ◽  
Lihui LIU ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document