Water abundance evaluation of a burnt rock aquifer using the AHP and entropy weight method: a case study in the Yongxin coal mine, China

2021 ◽  
Vol 80 (11) ◽  
Author(s):  
Jiankun Xue ◽  
Lei Shi ◽  
Hao Wang ◽  
Zhongkui Ji ◽  
Hongbo Shang ◽  
...  
2021 ◽  
Author(s):  
Lei Guo ◽  
Xiufen ZHANG

Abstract Partial destructive disassembly (PDD) is essential for end-of-life products to improve their automatic disassembly efficiency and reduce disassembly cost. A feasibility evaluation of the PDD is the key step to evaluate whether the PDD can be implemented. However, it has not been studied previously to our knowledge. To deal with this problem, a multi-granularity feasibility evaluation method is proposed. A multi-granularity feasibility evaluation model of the PDD was constructed based on the complex product’s hierarchical structure, which not only described the evaluation indices from the product level to the component level but also presented methods and rules to quantify them. 1Thus, disassembly entropy was introduced into the target group’s coarse granularity evaluation. The feasibility of the fine-grained index of the PDD for the component layer was constructed based on the product’s failure characteristic. The fine-grained index was calculated by the fuzzy trigonometric function and its weighting was obtained based on the structure entropy weight method. Thus, the results of the evaluation were used as feedback to guide the PDD process. Finally, a Passat engine case study illustrates the feasibility and effectiveness of the method.


2013 ◽  
Vol 275-277 ◽  
pp. 2748-2751
Author(s):  
Yang Wang ◽  
Chuan Ming Zhang ◽  
Zu He Wang

In order to choose the optimal construction scheme in the coal mine construction project, this paper establishes evaluation indexes and applies entropy weight method to determine the objective weight of evaluation index based on the expert scoring so that the evaluation results are more consistent with the actual situation. This method solves the drawbacks that the evaluation indexes depend on the subjective assumptions too much and provide an effective method for choosing the optimal bid scheme of the coal mine construction.


2017 ◽  
Vol 31 (11) ◽  
pp. 3667-3681 ◽  
Author(s):  
Shengzhi Huang ◽  
Bo Ming ◽  
Qiang Huang ◽  
Guoyong Leng ◽  
Beibei Hou

Sign in / Sign up

Export Citation Format

Share Document