Improving the pressuremeter approach for settlement calculation under high-speed railway embankments

2021 ◽  
Vol 6 (2) ◽  
Author(s):  
Youssouf Chalabi ◽  
Abdeldjalil Zadjaoui ◽  
Philippe Reiffsteck ◽  
Mohammed El Amin Bourouis
2012 ◽  
Vol 226-228 ◽  
pp. 1571-1576
Author(s):  
Xiao Yang ◽  
Guo Lin Yang

Considering the characteristics of high-speed railway settlement requirement, i.e. high precision and strict control after construction, the subgrade settlement of the Wuhan-Guangzhou high-speed rail on the red clay area is calculated by ES method, e-lgp method, triaxial stress method, secant modulus method and field test method. In this essay, the accuracy of various calculation methods has been compared and corrected with the values from loading test. In this process, correction coefficients for various calculation methods have been obtained.


2012 ◽  
Vol 132 (10) ◽  
pp. 673-676
Author(s):  
Takaharu TAKESHITA ◽  
Wataru KITAGAWA ◽  
Inami ASAI ◽  
Hidehiko NAKAZAWA ◽  
Yusuke FURUHASHI

2016 ◽  
Vol 106 (8) ◽  
pp. 490-497
Author(s):  
Dong-Uk PARK ◽  
Jae-Bong KIM ◽  
Nam-Sik KIM ◽  
Sung-Il KIM

Sign in / Sign up

Export Citation Format

Share Document