Integrated project delivery (IPD) method with BIM to improve the project performance: a case study in the Republic of Iraq
Keyword(s):
2020 ◽
Vol 12
(4)
◽
pp. 05020014
2016 ◽
2013 ◽
Vol 139
(7)
◽
pp. 795-804
◽
Keyword(s):
2014 ◽
Vol 11
(1)
◽
pp. 40-53
◽
2010 ◽
Vol 2
(4)
◽
pp. 248-254
◽