Green Construction Project Financing: Policies, Practices, and Research Efforts

Author(s):  
Hwang Bon-Gang
2016 ◽  
Vol 4 (2) ◽  
Author(s):  
Ida Ayu Praniti Tresna Putri ◽  
I N. Norken ◽  
I B. Rai Adnyana

Abstract : On the implementation of the construction project, financing is the main consideration due to the number of large and vulnerable to various risks. Cost control is the beginning of the estimates. An inaccurate estimation could have a negative impact on the whole process of construction. Because of estimation is reference in preparing the budget and used as control of the cost of projects, then required to major risk analysis that can be used as a basis in the mitigation. This research was conducted with qualitative descriptive method by interviews and survey. Data was collected by distributing questionnaires to the respondents using purposive sampling method, which simply selecting respondents who were competent and expert about the possible risks. The number of respondents was 25 who represent 8 construction project belonging to the government which is located in Denpasar. The results showed that there were 40 risks identified, from literature identified 16 risks and from brainstorming identified 24 risks. Than from 40 risks there are 34 major risks which was 9 risks classified as unacceptable and 25 risks classified as undesirable. Most dominant risks were the risks of estimator team and project. There were 16 mitigation measures at an unacceptable risk and 41 mitigitation measures at an undesirable risk. Most dominant risks were the risks of contractors and owner.


Author(s):  
Valeriya Pukhova

The need for improvement of the current mechanism of project financing for the construction of residential real estate arises from the analysis of the theory and practice of financing of the primary housing market. The use of the systemic approach has allowed the author to develop an improved mechanism of project financing, which comprises the principles of project financing, tools, forms of its regulation and methods of implementation of project financing. For efficient operation of the improved mechanism of project financing for the construction of residential real estate, a number of strategies have been proposed for the implementation of an investment and construction project, differing in design solutions, implementation period, marketing policy, rates of filling escrow accounts. The author proposes a scheme for a developer to choose project designs, which is based on the rules for land use and development and urban development regulations. A model for assessing the strategy for the implementation of an investment and construction project in project financing, taking into account the cost of a land plot, interest on a loan, selected design solutions, as well as the return on capital investments, was developed. In order to make a decision on the implementation of one or another investment and construction project for the construction of an apartment building, developers are invited to assess the options for design solutions and draw a conclusion about the most effective one according to the proposed model. The model can be used to assess the influence of the cost of a land plot in the structure of costs when the developer has a model project. It helps take into consideration project designs, the cost of the land plot according to the location of the designed facility, profitability of the expected capital investment and interest on the loan using escrow accounts.


2019 ◽  
Vol 138 ◽  
pp. 02021
Author(s):  
Marina Mishlanova

The paper determines the relevance and purpose of the study. The characteristic and functions of a special purpose vehicle of project financing are presented. The conditions of project lending are described. The ways of ensuring financial stability of the investment and construction project at various stages of its life cycle are considered. At the preinvestment stage, the financial model and budget of the project are considered as a mechanism for ensuring the sustainability of the project. The directions of normative and methodological support for effective financial modeling and project budgeting in the context of project financing are identified. At the implementation stage, a cost control system for the investment and construction project was developed. A formal decomposition of the control system under study is proposed, and a functional description of the subjects of control is presented. The conditions of preserving the project within the budget and adaptive management of investment and construction projects are considered.