Solar Concentrator Design and Construction Presented as Preprint 64-733 at the Third Biennial Aerospace Power Systems Conference, Philadelphia, Pa., September 1-4, 1964. The 44.5-ft concentrator was constructed under subcontract to Sundstrand Corporation for the U. S. Air Force. Work on the development of precoat foam materials was supported by Langley Research Center, NASA, Contract No. NAS 1-3301. Work on the development of the cone-and-column concentrator was supported in part by Langley Research Center, NASA, Contract No. NAS 1-3140.
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):