design and construction
Recently Published Documents


TOTAL DOCUMENTS

7492
(FIVE YEARS 1187)

H-INDEX

67
(FIVE YEARS 11)

2022 ◽  
Vol 896 ◽  
pp. 163125
Author(s):  
Guohong Zhang ◽  
Jiale Yang ◽  
Haicheng Xuan ◽  
Jiangtao Yang ◽  
Xiaohong Liang ◽  
...  

Encyclopedia ◽  
2022 ◽  
Vol 2 (1) ◽  
pp. 70-95
Author(s):  
Tharaka Gunawardena ◽  
Priyan Mendis

Modern Methods of Construction with Offsite Manufacturing is an advancement from prefabricated technologies that existed for decades in the construction industry, and is a platform to integrate various disciplines into providing a more holistic solution. Due to the rapid speed of construction, reduced requirement of labour and minimised work on site, offsite manufacturing and prefabricated building systems are becoming more popular, and perhaps a necessity for the future of the global construction industry. The approach to the design and construction of prefab building systems demands a thorough understanding of their unique characteristics.


AIP Advances ◽  
2022 ◽  
Vol 12 (1) ◽  
pp. 015314
Author(s):  
T. B. Ouyang ◽  
Y. Z. Qian ◽  
S. Q. Liu ◽  
X. S. Yang ◽  
X. C. Chen

2022 ◽  
Author(s):  
Haiyan Jiang ◽  
Yang Li ◽  
Xu Wang ◽  
Xiaodong Hong

Microstructure design and construction of heterojunction are the major strategies for enhancing the photocatalytic activity of semiconductors. Herein, Bi2WO6 flower spheres are synthesized and acted as porous templates for depositing...


2022 ◽  
pp. 202-224
Author(s):  
Robert Hopkins ◽  
Stephen Howard Edge

This chapter catalogues the working experiences of the architects AHR and their design team and their clients, the Royal College of Physicians, for the design and construction of The Spine, their new Northern HQ, in Liverpool, UK. This iconic building opened in early 2021 and optimistically reflects the ethos and values of the college, and it is set to become one of the healthiest buildings in the world. It will describe and explain the biophilic and salutogenic design construction processes taken by the design team, from commissioning to completion. The main objective for the college when commissioning AHR architects to design their new building was to significantly expand their facilities and to reflect their standing in the world of medicine. So, the AHR design team endeavored to help them attain their goal of a WELL Platinum and the Building Research Establishments Environmental Assessment Methods (BREEAM) Outstanding certification.


Author(s):  
Gültekin Zafer ◽  
Alper Mürsel ◽  
Akay Cengiz ◽  
Hacıismailoğlu M Cüneyt

Sign in / Sign up

Export Citation Format

Share Document