Noise mitigation action plan of Pisa civil and military airport and its effects on people exposure

2014 ◽  
Vol 84 ◽  
pp. 25-36 ◽  
Author(s):  
Gaetano Licitra ◽  
Paolo Gagliardi ◽  
Luca Fredianelli ◽  
Duccio Simonetti
KREA-TIF ◽  
2021 ◽  
Vol 9 (2) ◽  
pp. 21
Author(s):  
Rahmat Yasirandi ◽  
Andrian Rakhmatsyah ◽  
Fauzi Kurniawan

<p><em>Seharusnya dampak risiko IT yang timbul pada operasional di sebuah organisasi yang terjadi tidak bisa diabaikan begitu saja. Tak terkecuali yang sering terjadi pada restoran atau kafe. Masalah operasional yang sering ditemui adalah masalah jaminan informasi terkait pelayanan. Karena mempengaruhi tingkat kepercayaan pelanggan terhadap setiap layanan yang diberikan pihak restoran atau kafe. Setelah dilakukan manajemen tersebut, ternyata didapat bahwa kepercayaan pelanggan terkait jaminan informasi dapat diturunkan lagi menjadi 2 problems research yaitu terkait informasi yang pasti mengenai informasi status layanan, dan yang kedua terkait informasi seberapa cepat layanan yang akan pelanggan dapatkan. Sehingga di rancanglah sebuah sistem layanan informasi pesanan yang dapat menjamin kepercayaan pelanggan akan layanan informasi untuk setiap prosesnya. sehingga restoran akhirnya dapat mengurangi risiko yang dapat terjadi pada operasionalnya. Dari hasil mitigasi telah menghasilkan evaluasi bahwa risiko R2, R3, R4, R5, R6, dan R7 telah berhasil di mitigasi dengan hasil Eliminate. Dan untuk R1 dengan hasil Reduce. Dari hasil ini disimpulkan bahwa sistem yang diusulkan sebagai sebuah mitigation action plan telah terbukti dapat memitigasi risiko operasional terkait proses pesanan.</em></p>


Author(s):  
Ali Reja Osmani

Pursuant to the Thirteenth Conference of Parties to the UNFCCC held at Bali in 2007, based on Nationally Appropriate Mitigation Action plan, India has introduced its very own Emission Trading Scheme (ETS) called Perform, Achieve and Trade (PAT) market mechanism. The country has already achieved remarkable success in the renewable energy front. This chapter studied the existing policy regime of renewable energy and energy efficiency, and tried to understand how far the country practically can achieve the objective enshrined by PAT mechanism. This paper highlighted the background of the market based ETS, where various policies and legislation were put in place to provide energy efficient service and energy efficient system to the large energy intensive sectors of Indian economy. However it is not conducive to come to a conclusion regarding PAT's success or failure unless the First PAT cycle is completed, i.e. 2012-13 to 2014-15 compliance period is over.


2018 ◽  
Vol 73 ◽  
pp. 02009
Author(s):  
Untari ◽  
Edy H.P Melmambessy ◽  
David Oscar Simatupang

Merauke district is one of the areas developing still need clearing land required for the expansion of farming land, Plantations and land clearing to a new settlement.Using forward looking method, Clearing land for the benefit of development produce carbon emissions. Carbon emissions 2014 to 2025 of 40.4 million tons CO2-eq with a total emission clean 20.7 tons CO2-eq. While carbon emissions Merauke in 2030 decreased to 37.3 million tons CO2-eq with a total emission clean of 15.4 million tons CO2-eq. To reduce carbon emissions, Merauke do 6 action plan mitigation in unit agricultural planning wetlands and agriculture dry land, production forest, natural heritage land, an absorbing area, mangrove forests and plantation.The carbon emissions reduction in 2030 namely 15.41 % equivalent to 51.5 million tons CO2-eq decline emissions from 6 mitigation action.


Sign in / Sign up

Export Citation Format

Share Document