A soft computing approach based on critical chain for project planning and control in real-world applications with interval data

2021 ◽  
Vol 98 ◽  
pp. 106915
Author(s):  
S. Aramesh ◽  
S.M. Mousavi ◽  
V. Mohagheghi ◽  
E.K. Zavadskas ◽  
J. Antucheviciene
2019 ◽  
Vol 36 (03) ◽  
pp. 1950010 ◽  
Author(s):  
Xuejun Hu ◽  
Jianjiang Wang ◽  
Kaijun Leng

In the past decades, the critical chain scheduling and buffer management (CC/BM) methodology has gained widespread acceptance as an emerging project planning and control technique. This paper first presents six priority indices for selecting the optimal critical chain when more than one such chain is possible. Next, we examine four schedule generation schemes for rescheduling, along with two control actions (i.e., expediting work to shorten activity durations and adding emergency resources to bring forward activity start times) for repairing a critical chain schedule whenever activity delays cross the buffer threshold. The main results of our computational experiments include the non-negligible impact of different critical chain sequences on the project robustness measures, the appropriate level of feeding buffer sizes, and the trade-off between different reactive responses in relation to the cost factors or management preferences.


Sign in / Sign up

Export Citation Format

Share Document