Approaches for the joint resolution of lot-sizing and scheduling with infeasibilities occurrences

2021 ◽  
pp. 107176
Author(s):  
Fernanda F. Alves ◽  
Thiago H. Nogueira ◽  
Mauricio C. de Souza ◽  
Martín G. Ravetti
1997 ◽  
Vol 99 (2) ◽  
pp. 221-235 ◽  
Author(s):  
A. Drexl ◽  
A. Kimms

2013 ◽  
Vol 37 (23) ◽  
pp. 9516-9523 ◽  
Author(s):  
Narges Sereshti ◽  
Mehdi Bijari

2009 ◽  
Vol 36 (9) ◽  
pp. 2690-2698 ◽  
Author(s):  
C. Gicquel ◽  
N. Miègeville ◽  
M. Minoux ◽  
Y. Dallery

2009 ◽  
Vol 3 (2) ◽  
pp. 37-48
Author(s):  
Waldemar Kaczmarczyk

This paper presents some important alternatives for modelling Lot-Sizing and Scheduling Problems. First, the accuracy of models can improved by using short time buckets, which allow more detailed planning but lead to higher computational effort. Next, valid inequalities make the models tighter but increase their size. Sometimes it is possible to find a good balance between the size and tightness of a model by limiting a priori the number of valid inequalities. Finally, a special normalization of the variables simplifies the presentation of results and validation of models.


Sign in / Sign up

Export Citation Format

Share Document