Multi-mode resource constrained multi-project scheduling and resource portfolio problem

2015 ◽  
Vol 240 (1) ◽  
pp. 22-31 ◽  
Author(s):  
Umut Beşikci ◽  
Ümit Bilge ◽  
Gündüz Ulusoy
2020 ◽  
Vol 165 ◽  
pp. 06055
Author(s):  
Ru Wang ◽  
Jing Lian

Considering multiple possible scenarios in the process of project construction, the prefabricated project scheduling problem is studied in combination with the theory of multi-mode resource-constrained project scheduling problem. Multi-objective multi-mode resource-constrained project scheduling model with time/robustness trad-offs was constructed. Next, the adjusted non-dominated genetic algorithm (NSGA-II) was designed to solve the model. Finally, the proposed model and algorithm were implicated to a real project, in order that research achievement can guide managers to make decisions and invest resources scientifically and reasonably.


Sign in / Sign up

Export Citation Format

Share Document