Failure analysis of ruptured pipe connected to natural gas pre-heater
2006 ◽
Vol 13
(5)
◽
pp. 797-804
◽
2019 ◽
Vol 105
◽
pp. 638-646
◽
2016 ◽
Vol 63
◽
pp. 61-71
◽
2016 ◽
Vol 64
◽
pp. 126-143
◽
2013 ◽
Vol 32
◽
pp. 188-201
◽
Keyword(s):
2015 ◽
Vol 88
(9)
◽
pp. 1510-1516
◽
2018 ◽
Vol 85
◽
pp. 77-88
◽
Keyword(s):
2013 ◽
Vol 13
(6)
◽
pp. 653-657
◽
Keyword(s):