scholarly journals Empirical seismic fragility functions based on field survey data after the 5 May 2014 Mae Lao (Northern Thailand) earthquake

2020 ◽  
Vol 42 ◽  
pp. 101344
Author(s):  
Piyawat Foytong ◽  
Teraphan Ornthammarath
2018 ◽  
pp. 363-373
Author(s):  
Allen E. Winkelmann
Keyword(s):  

Environments ◽  
2015 ◽  
Vol 2 (4) ◽  
pp. 1-31 ◽  
Author(s):  
Michael Elias ◽  
Oliver Hensel ◽  
Uwe Richter ◽  
Christian Hülsebusch ◽  
Brigitte Kaufmann ◽  
...  

1971 ◽  
Vol 9 (2-3) ◽  
pp. 167
Author(s):  
G.D. Lodwick ◽  
J. Whittle

2012 ◽  
Vol 424-425 ◽  
pp. 330-333
Author(s):  
Yan Xiao ◽  
Yun Yun Li ◽  
Qiu Hong Jia

Combined with the field survey data, this paper firstly analyzed the production status of an engine assembly plant, identified the problems reduced production efficiency; and then proposed re-introduction of Kanban production system to help enterprises overcome the present impasse. This paper focused on describing the import plan, the overall design and executing conditions of Kanban production system,which to be a reference example for other enterprises who want to adopt Kanban production system


Sign in / Sign up

Export Citation Format

Share Document