Schedule delay analysis of prefabricated housing production: A hybrid dynamic approach

2018 ◽  
Vol 195 ◽  
pp. 1533-1545 ◽  
Author(s):  
Clyde Zhengdao Li ◽  
Jingke Hong ◽  
Cheng Fan ◽  
Xiaoxiao Xu ◽  
Geoffrey Qiping Shen
2019 ◽  
Vol 128 ◽  
pp. 346-357 ◽  
Author(s):  
Pier Luigi Guida ◽  
Giovanni Sacco

2013 ◽  
Vol 19 (6) ◽  
pp. 823-835 ◽  
Author(s):  
Ming-Kuan Tsai ◽  
Jyh-Bin Yang ◽  
Nie-Jia Yau

Schedule analysts often resolve diverse schedule delay problems in construction projects based on their subjective experiences. Although various process-based and mathematical-model schedule delay analysis methods are available for effective schedule delay analysis, these methods require time-consuming manual operation. The use of computer-based schedule delay analysis methods seems to be a solution. However, schedule analysts still have difficulty developing computer-based schedule delay analysis methods. Therefore, this study applies information flow analysis to classify the necessary work to develop computer-based schedule delay analysis methods. In contrast to numerous studies that focus only on computerizing a process-based or a mathematical-model schedule delay analysis method, this study constructs a computer-based method that integrates two process-based schedule delay analysis methods simultaneously. In a tested case study, the delay liability for the project owner and contractor was classified successfully. Importantly, this study provides a useful reference for similar applications in project management.


2021 ◽  
Vol 1091 (1) ◽  
pp. 012038
Author(s):  
Balakrishna Ch ◽  
K Anand Goud ◽  
Akula Prakash ◽  
Kandlagunta Mounika

Author(s):  
Amritha Rani George ◽  
Minu Anna Johny ◽  

Buildings ◽  
2019 ◽  
Vol 9 (9) ◽  
pp. 191 ◽  
Author(s):  
Samad M. E. Sepasgozar ◽  
Reyhaneh Karimi ◽  
Sara Shirowzhan ◽  
Mohammad Mojtahedi ◽  
Sabbar Ebrahimzadeh ◽  
...  

Delay is one of the main challenges of construction projects, and there is still much to overcome in order to reach near zero delay in all construction projects. This project aims to conduct a systematic critical review including a bibliography analysis on delay literature in construction. The main questions consider what has been learnt from a decade investigating delay causes and effects in the construction literature and what factors have been missed in the literature. This paper also presents a new and challenging question regarding how digital tools and associated technologies may prevent any delay in construction projects, which can change the research direction from delay investigations to identifying prevention factors. The paper identifies the delay dataset, including 493 papers investigating delay in construction, and establishes a specific dataset of papers focusing on delay effects and causes (DEC), including 94 selected papers covering different factors examined in over 29 countries such as Iran, India, Turkey, Bangladesh, Saudi Arabia, the United Arab Emirates (UAE), Cambodia, Oman, Malaysia, Taiwan, China, Vietnam, the US, the UK, and Egypt. In addition, the paper identifies 30 critical factors with the frequency of occurrences over three times in the DEC dataset and computes their medians of ranking. This paper also discusses digital tools and methods that can be used for delay analysis and preventions, including MS Project, Oracle Primavera P6, and Open Plan by Deltek. The paper discusses the project schedule delay analysis from project management methodology perspectives. It also discusses the current method’s limitations and future directions, which are based on the identification of the deficiency areas. In total, four overlooked factors are identified and suggested, including faulty data analysis, unmatched structure of the research questionnaires with new knowledge and standards [e.g., Project Management Body of Knowledge (PMBOK)], overlooked effects of digital technologies [e.g., Digital twin, Navisworks, Building Information Model (BIM), Geographic Information System (GIS), and Integrated Project Delivery (IPD)], and ignored job-site technologies. In addition, the paper presents the DEC model for future studies, including four main key factors. These factors are resources (e.g., project budgets, labour, material, equipment, and digital tool), project context, stakeholders performance (e.g., owner/client, consultant/designer, contractor, vendor/supplier), and external factors (e.g., ground condition, site location, regulation, natural disaster), which may significantly affect delay prevention and should be concurrently considered in the future delay investigations, since they may be required for designing an effective mitigation strategy when these proof points are identified. This would significantly help to utilise digital systems to prevent time overruns in different construction contexts.