Operation of a double-phase pure argon Large Electron Multiplier Time Projection Chamber: Comparison of single and double phase operation
2010 ◽
Vol 617
(1-3)
◽
pp. 188-192
◽
Keyword(s):
2012 ◽
Vol 7
(08)
◽
pp. P08026-P08026
◽
Keyword(s):
2014 ◽
Vol 9
(03)
◽
pp. P03017-P03017
◽
Keyword(s):
Keyword(s):
Performance study of the effective gain of the double phase liquid Argon LEM Time Projection Chamber
2015 ◽
Vol 10
(03)
◽
pp. P03017-P03017
◽
Keyword(s):
2010 ◽
Vol 5
(03)
◽
pp. P03001-P03001
◽
Keyword(s):