In 1982 to 83 a preliminary conceptual design of a heavy-ion-driven inertial fusion (HIF) system, called HIBLIC-I (Heavy Ion Beam and LIthium Curtain) was worked out (The Working Group on ‘HIBLIC-I’ 1984). Its principal aims are: (i) to find out the critical issues in this approach to fusion power plant, (ii) to assess its feasibility and (iii) to promote good collaboration between different fields (such as accelerator physics, plasma science and reactor technology) and of different institutions in Japan. (Obayashi 1981; Hirao 1982).


1992 ◽  
Vol 23 (5) ◽  
pp. 83-86 ◽  
Author(s):  
R. Bock
Keyword(s):  

1999 ◽  
Vol 75 (2) ◽  
pp. 121-125
Author(s):  
Masao OGAWA ◽  
Kazuhiko HORIOKA ◽  
Toshiyuki HATTORI

1998 ◽  
Vol 5 (5) ◽  
pp. 1895-1900 ◽  
Author(s):  
Max Tabak ◽  
Debra Callahan-Miller

2002 ◽  
Vol 20 (3) ◽  
pp. 515-520 ◽  
Author(s):  
D.T. GOODIN ◽  
A. NOBILE ◽  
N.B. ALEXANDER ◽  
L.C. BROWN ◽  
J.L. MAXWELL ◽  
...  

The Target Fabrication Facility (TFF) of an inertial fusion energy (IFE) power plant must supply about 500,000 targets per day. The target is injected into the target chamber at a rate of 5–10 Hz and tracked precisely so the heavy ion driver beams can be directed to the target. The feasibility of developing successful fabrication and injection methodologies at the low cost required for energy production (about $0.25/target, approximately 104 times less than current costs) is a critical issue for inertial fusion energy. A significant program is underway to develop the high-volume methods to supply economical IFE targets. This article reviews the requirements for heavy ion driven IFE target fabrication and injection, and presents the current status of and results from the development program. For the first time, an entire pathway from beginning to end is outlined for fabrication of a high-gain, distributed radiator target. A significant development and scale-up program will be necessary to implement this pathway for mass production of IFE targets.