Bridging by Reversibly Adsorbed Telechelic Polymers: A Transient "Network"

1994 ◽  
Vol 27 (18) ◽  
pp. 5037-5042 ◽  
Author(s):  
Sanjay Misra ◽  
Mai Nguyen-Misra ◽  
Wayne L. Mattice

2000 ◽  
Vol 12 (8A) ◽  
pp. A491-A498 ◽  
Author(s):  
F Molino ◽  
J Appell ◽  
M Filali ◽  
E Michel ◽  
G Porte ◽  
...  


2008 ◽  
Vol 52 (2) ◽  
pp. 359-377 ◽  
Author(s):  
Kaori Nakaya–Yaegashi ◽  
Laurence Ramos ◽  
Hervé Tabuteau ◽  
Christian Ligoure


2007 ◽  
Vol 40 (4) ◽  
pp. 1248-1251 ◽  
Author(s):  
Laurence Ramos ◽  
Christian Ligoure


1996 ◽  
Vol 36 (3) ◽  
pp. 175-180
Author(s):  
L. Barretta ◽  
P. Cremonesi ◽  
E. Panzeri ◽  
N. Scarabottolo


1982 ◽  
Vol 8 (11-12) ◽  
pp. 571-578 ◽  
Author(s):  
Joseph P. Kennedy ◽  
Suhas C. Guhaniyogi ◽  
Virgil Percec




Polymer ◽  
2004 ◽  
Vol 45 (26) ◽  
pp. 9071 ◽  
Author(s):  
Jungahn Kim ◽  
Sang Seob Kim ◽  
Keon Hyeong Kim ◽  
Yong Hyun Jin ◽  
Soon Man Hong ◽  
...  


2016 ◽  
Vol 17 (3) ◽  
pp. 311-326 ◽  
Author(s):  
Manohar Singh ◽  
B.K. Panigrahi ◽  
T. Vishnuvardhan

Abstract In this paper an improved over current relay coordination protection technique is proposed. The proposed technique eliminates the sympathetic/nuisance tripping in an interconnected distribution system. Nuisance trippings are eliminated by incorporating the additional selectivity constraints in conventional over current relay coordination problem. Whenever the fault is cleared only from one end of the line in bidirectional fault feed lines, transient network configuration comes into existence. Transient network configuration causes the redistribution of fault in the distribution system and leads to further nuisance tripping of relays. This problem in this paper is solved by minimising the operating time gap between primary relays located at near end and far end of a faulty line to the best minimum possible value. The differential search algorithm is applied for optimization of highly non-linear over current relay coordination problem in this paper. The result presented in this paper shows that the proposed over current relay coordination technique is immune against the sympathetic/nuisance tripping and operating time difference between primary relays at near end and far end is also minimised within acceptable time margin successfully.



Sign in / Sign up

Export Citation Format

Share Document