scholarly journals Estimating the economic value of water quality protection in the Catawba River basin

2002 ◽  
Vol 38 (9) ◽  
pp. 21-1-21-10 ◽  
Author(s):  
Randall A. Kramer ◽  
Jonathan I. Eisen-Hecht
2008 ◽  
Vol 41 (2) ◽  
pp. 169-187 ◽  
Author(s):  
W. Kip Viscusi ◽  
Joel Huber ◽  
Jason Bell

2018 ◽  
Vol 6 (3) ◽  
pp. 9
Author(s):  
Hendra Pratama ◽  
Slamet Budi Yuwono ◽  
Hari Kaskoyo ◽  
Samsul Bakri

Way Betung watershed is a source of raw water supply utilized by the Talang Mulya community for various purposes, such as for household needs, irrigation of paddy farming and micro hydro power plant. Water availability is closely related to the existing forest presence in the area, the forest land management should be in balance on be half of maintaing water availability. This study aimed to determine the perception of the community and to analyze the economic value of water for household needs, irrigation of paddy farming and micro hydro power plant. This research also calculated the Willingness to Pay of forest and land rehabilitation costs by community. Primary data collection were conducted by interviewing 106 respondents. The results showed that the community appraisal of water resources in Way Betung watershed were good since 88% of respondents are willing to pay for forest rehabilitation. The total economic value of water utilization in Talang Mulya Village was Rp.2.963.540.390/year and the value of willingness to pay for forest rehabilitation costs was Rp.5.833.608/year with average willingness to pay was Rp.22.948/year. Keywords: watershed , total economic value, the economic value of water, willingness to pay.


Author(s):  
Haixia Zheng ◽  
Stale Navrud ◽  
Shiran Shen

Payment for Environmental Services (PES) in the watershed has been widely adopted as an important policy instrument to compensate upstream water users for providing water quality improvement for the whole river basin. In this paper, we use three independent valuation methods to determine the price of ecosystem service (ES), particularly water quality, in Miyun Reservoir, the main surface water source for Beijing. We find that the value of water quality is lowest using opportunity cost of limitation of development rights (OCLDR), highest with contingent valuation method (CVM), and water resources benefits assessment (WRBA) gives an in-between value. OCLDR determines the size of subsidies from those that benefit from water quality improvement from upstream. WRBA is a reference for compensation criteria to the upstream government and farmers when water resources are transferred across jurisdictional boundaries. CVM not only captures the direct value of water quality improvement, but also the indirect value of improvement in other ecosystem services as a result of improvement in water quality. Based on the results, we propose a multi-level ecological compensation system for the Miyun Reservoir river basin. We use OCLDR to determine subsides/ compensation to upstream farmers and other suppliers of the ES; WRBA set the price of water transfer; and CVM to figure out the size of payments for integrated water quality improvement.


Sign in / Sign up

Export Citation Format

Share Document