Local Skill Development from China’s Engagement in Africa: Comparative Evidence from the Construction Sector in Ghana

Author(s):  
Eugene Bempong Nyantakyi ◽  
Qingwei Meng ◽  
Matthew T. Palmer
2019 ◽  
Vol 50 (1) ◽  
pp. 16-33 ◽  
Author(s):  
Elizabeth Runnion ◽  
Shelley Gray

PurposeChildren with hearing loss may not reach the same level of reading proficiency as their peers with typical development. Audiologists and speech-language pathologists (SLPs) have important roles to play in preventing this problem early in children's development. In this tutorial, we aim to communicate how the habilitation practices of audiologists and intervention services of SLPs can support early literacy skill development in children with hearing loss.MethodWe describe key findings from peer-reviewed research articles to provide a review of early literacy skill development, to explain the relationship between early literacy skills and conventional reading skills, and to highlight findings from early literacy skill intervention studies that included children with hearing loss who use spoken language. We conclude with a hypothetical case study to illustrate how audiologists and SLPs can support early literacy acquisition in children with hearing loss.ConclusionFindings from studies of young children with hearing loss suggest that a promising approach to improving reading outcomes is to provide explicit early literacy instruction and intervention.


2014 ◽  
Author(s):  
Rodney K. Goodyear ◽  
James W. Lichtenberg ◽  
Bruce E. Wampold ◽  
Terence T. J. Tracey

2010 ◽  
Author(s):  
Sandro Scielzo ◽  
Fleet Davis ◽  
Jennifer M. Riley ◽  
John Hyatt ◽  
Donald Lampton ◽  
...  

The issues of determining the estimated cost of capital construction projects with the involvement of Federal budget funds at the stage of development of project documentation, during verification of the accuracy of determining the estimated cost and the initial (maximum) contract price are considered. On the basis of the assessment of amendments to urban planning legislation for the purpose of implementing a state contract by the contractor ( based on the results of competitive procedures or without competitive procedures by decision of state authorities), the procedure for forming the estimate as part of a state (municipal) contract, the price of which is firm, is presented. For the purpose of mutual settlements between the customer and the contractor for the work performed, the formation of primary accounting documentation, as well as for checking the work performed by regulatory authorities, an example of drawing up an estimate of the state (municipal) contract on the basis of grouping costs according to structural elements and complexes of work is given. The result of the research conducted was the development of regulations and the formation of criteria for their practical application by state bodies, institutions, organizations and other participants in the investment-construction process, as well as recipients of budget funds, who perform the functions of the state (municipal) customer, developer and technical customer.


Sign in / Sign up

Export Citation Format

Share Document