Closure to “Developing a Resource Supply Chain Planning System for Construction Projects” by H. Ping Tserng, Samuel Y. L. Yin, and Sherman H. A. Li

2008 ◽  
Vol 134 (5) ◽  
pp. 384-386 ◽  
Author(s):  
H. Ping Tserng ◽  
Samuel Y. Yin ◽  
Sherman H. Li
2020 ◽  
Vol 53 (2) ◽  
pp. 10761-10766
Author(s):  
Walid Elmughrabi ◽  
Oumaima Ben Sassi ◽  
Thien-My Dao ◽  
Amin Chabaane

2010 ◽  
Vol 171-172 ◽  
pp. 551-554
Author(s):  
Kai Gan

The study on the decentralized control supply chain system is an important content of supply chain management (SCM) under the highly developed information technology environment.In order to enhance and improve the response speed and adaptability of changing market environment for the current supply chain planning system, this article used the theory of Multi-Agent system(MAS) operation mechanism in comparison with decentralized control supply chain system and others on the basis of the similarity and adaptability, then proposed a method of using the multi-agent system technology to solve the problem of the decentralized control supply chain production planning. Through further analysis, the article gave different production planning framework model according competition-cooperation relationship under decentralized control supply chain system.


2022 ◽  
Vol 154 ◽  
pp. 111816
Author(s):  
José Ezequiel Santibañez-Aguilar ◽  
Juan José Quiroz-Ramírez ◽  
Eduardo Sánchez-Ramírez ◽  
Juan Gabriel Segovia-Hernández ◽  
Antonio Flores-Tlacuahuac ◽  
...  

2018 ◽  
Vol 2018 ◽  
pp. 1-5 ◽  
Author(s):  
Shaoli Wang ◽  
Yasir Mursalin ◽  
Gang Lin ◽  
Conghua Lin

This paper considers the problem of predicting a supply chain cost for prefabricated building construction under an uncertain situation. Based on the Activity-Based Costing (ABC) method, we establish a computational model to estimate the total cost of the prefabricated supply chain. The model can assist in not only finding the critical areas for cost reduction of the whole supply chain but also analyzing other costs of prefabricated construction projects. Furthermore, we provide a numerical example of prefabricated building construction to validate the results.


Sign in / Sign up

Export Citation Format

Share Document