Study on the Technique of Laying Gas Pipes in Xi'Jiang River Slurry Shield Tunnel

Author(s):  
Xiaojun Zhou ◽  
Jin Wang ◽  
Hongyun Hu ◽  
Xiaofeng Wang
Keyword(s):  
2021 ◽  
Vol 34 (2) ◽  
pp. 04020118
Author(s):  
Song Zhou ◽  
Guan-Lin Ye ◽  
Lei Han ◽  
Wang Jian-Hua

2021 ◽  
Vol 35 (5) ◽  
pp. 04021068
Author(s):  
Daxin Geng ◽  
Yuchen Hu ◽  
Yalong Jiang ◽  
Ning Wang ◽  
Wentao Hu

2014 ◽  
Vol 919-921 ◽  
pp. 1104-1109
Author(s):  
Chen Rui Pang ◽  
Xin Wen

Waste soil progressing in shield tunnel construction should occupy large space, on the other hand, do harm to city environment. If the waste sand in silt and fine sand layer can be used as sand source of synchronous grouting, it will bring benefits for the enterprise and society. In indoor experiment, we select waste sand in different layers, sieved as sand source, then use the waste sand to produce slurry and compare their strength with the construction slurry’s. The study found, sieved waste sand in silt and fine sand layer can be used as sand source for making synchronous grouting slurry.


Author(s):  
Cong Zhang ◽  
Kui Chen ◽  
Junsheng Yang ◽  
Jinyang Fu ◽  
Shuying Wang ◽  
...  

2013 ◽  
Vol 405-408 ◽  
pp. 1268-1272 ◽  
Author(s):  
Xiao Jun Zhou ◽  
He Ran Yu ◽  
Xiao Feng Wang ◽  
Hong Yun Hu

In terms of oil and natural gas pipe to be installed in working shaft, and in light of basic dimension of slurry shield machine and its supporting system, required parameters of working shaft, such as its diameter, lining structure, building envelope have been presented in this paper. Meanwhile, the thickness of building envelope and permanent concrete lining for working shaft is also proposed through the analysis of its elastic stability and anti-buoyancy under influence of earth and ground water pressure.


Sign in / Sign up

Export Citation Format

Share Document