Reuse of Discharged Soil from Slurry Shield Tunnel Construction as Synchronous Grouting Material

Author(s):  
Cong Zhang ◽  
Kui Chen ◽  
Junsheng Yang ◽  
Jinyang Fu ◽  
Shuying Wang ◽  
...  
2014 ◽  
Vol 919-921 ◽  
pp. 1104-1109
Author(s):  
Chen Rui Pang ◽  
Xin Wen

Waste soil progressing in shield tunnel construction should occupy large space, on the other hand, do harm to city environment. If the waste sand in silt and fine sand layer can be used as sand source of synchronous grouting, it will bring benefits for the enterprise and society. In indoor experiment, we select waste sand in different layers, sieved as sand source, then use the waste sand to produce slurry and compare their strength with the construction slurry’s. The study found, sieved waste sand in silt and fine sand layer can be used as sand source for making synchronous grouting slurry.


2021 ◽  
Vol 34 (2) ◽  
pp. 04020118
Author(s):  
Song Zhou ◽  
Guan-Lin Ye ◽  
Lei Han ◽  
Wang Jian-Hua

2011 ◽  
Vol 71-78 ◽  
pp. 32-36 ◽  
Author(s):  
Xin Jiang Wei ◽  
Jie Hong ◽  
Gang Wei

Considering the interaction of building-soil-tunnel, the grillage beams foundation frame building vertical crossed by Double-O-Tube (DOT) shield tunnel was simulated by 3D MIDAS/ GTS software, and the impact of construction on the building was analyzed. The results show that: the ground settlement trough caused by DOT shield tunnel can be fitted by peck formula; during the passage of the shield tunneling through the building, the settlement of the building increased and settlement trough was wilder; the settlement was stable and had a little rebound when shield machine already passed the building; with the increase of driving distance, the first principal stress P1 increased and then was stable; with the increase of L, the shape of foundation settlement curve changed, and the maximum differential settlement between columns increased but was small.


1999 ◽  
Vol 39 (3) ◽  
pp. 99-112 ◽  
Author(s):  
Tadashi Sugiyama ◽  
Toshiyuki Hagiwara ◽  
Toshi Nomoto ◽  
Masaaki Nomoto ◽  
Yutaka Ano ◽  
...  

Author(s):  
Xiaojun Zhou ◽  
Jin Wang ◽  
Hongyun Hu ◽  
Xiaofeng Wang
Keyword(s):  

2011 ◽  
Vol 374-377 ◽  
pp. 2326-2332
Author(s):  
Jun Lian Li ◽  
Jian Guo Zheng ◽  
Yang Ping Yao

This paper refers the case project of the Xi'an Subway Line 2 tunneling through the South Gate area of the Xi'an City Wall, has researched the surface settlement due to tunnel construction, and simulated the whole shield tunnel by using Flac3D numerical analysis. This paper has obtained the law of surface settlement and the influence on the City Wall in the tunnel construction by analyzing the calculation results, and simulated the effects of three protective measures which will be used in the South Gate area. The results showed that the surface settlement ratio after the piles and chemical grouting reinforcement was lower by about 25% than no reinforcement. The monitoring data showed that the result of model calculation was reasonable, and the protective measures in Condition 3 are feasible and effective.


2021 ◽  
Vol 35 (5) ◽  
pp. 04021068
Author(s):  
Daxin Geng ◽  
Yuchen Hu ◽  
Yalong Jiang ◽  
Ning Wang ◽  
Wentao Hu

Sign in / Sign up

Export Citation Format

Share Document