scholarly journals Economic analysis of transmission line engineering based on industrial engineering

2017 ◽  
Author(s):  
Yixuan Li
2020 ◽  
Vol 1601 ◽  
pp. 022035
Author(s):  
Wenhan Chen ◽  
Xuecheng Qi ◽  
Jingyu Fang ◽  
Jian Shao ◽  
Chao Chen

2013 ◽  
Vol 753-755 ◽  
pp. 3198-3200
Author(s):  
Hai Ying Zhou ◽  
Chun Lei Bu ◽  
Ming Jiang

Conductor scheme is one of key issues in the design of the UHVDC transmission project, and it is significant for the construction cost and safe operation of transmission line. It can be concluded from analysis on application of existing conductor that the appropriate decrease in number of bundle conductor and increase of the conductor cross-section will reduce line loss, which has remarkable social-economic benefits. In this paper, the economic analysis of large cross-section conductor is conducted based on UHVDC Project. Some useful suggestions are given.


2014 ◽  
Vol 580-583 ◽  
pp. 601-605
Author(s):  
Yan Zhang ◽  
Wei Feng Zheng

Rock anchor foundation can be widely used for the practical transmission line engineering in mountain areas. On strong-weathered sandstone ground, ten sets of uplift static load test of single rock anchor foundation were carried out. Based on the testing results, the typical failure modes and the ultimate uplift bearing capacity of foundations were obtained. Internal force distribution and effective anchorage depth were investigated through stain measurements. Design parameters of rock anchor foundation on sandstone ground were proposed, which can provide a reference for transmission line engineering design.


2013 ◽  
Vol 457-458 ◽  
pp. 1575-1580 ◽  
Author(s):  
Zhen Liu ◽  
Kuan Jun Zhu ◽  
Jian Cheng Wan ◽  
Jun Zhang ◽  
Jia Jun Si ◽  
...  

At present, large section conductors applied in domestic ±800kV ultra-high DC power transmission line consist of 6×720mm2, 6×900mm2 and 6×1000mm2 conductors. This paper analyzes initial engineering investment and mechanical performance of 6×JL1/G2A-720/50, 6×JL1/G3A-900/40, 6×JL1/G3A-1000/45, 6×JL1/G2A-1250/70 and 6×JL1/G2A-1520/125 conductor plans, carry out economic comparison of the whole life period of these 5 conductor plans, demonstrate economic of 6×JL1/G2A-1250/70, and 6×JL1/G2A-1520/125 conductor plans in ±800kV ultra-high DC power transmission line is more advantageous when annual loss hours is too high, and the 6×JL1/G2A-1250/70 plan can save initial investment of engineering compared to the 6×JL1/G2A-1520/125 plan.


2020 ◽  
Vol 1634 ◽  
pp. 012162
Author(s):  
De Guang Zhang ◽  
Xiang Liang Shen ◽  
Fan Gao ◽  
Ya Ning Ren ◽  
Li Huan Wang ◽  
...  