Joint optimization of a flow-shop group scheduling with sequence dependent set-up times and skilled workforce assignment
2014 ◽
Vol 52
(9)
◽
pp. 2696-2728
◽
Keyword(s):
2022 ◽
Vol 16
(1)
◽
pp. 40
Keyword(s):
2022 ◽
Vol 16
(1)
◽
pp. 40
Keyword(s):
2015 ◽
Vol 28
(6)
◽
pp. 1269-1283
◽
Keyword(s):
2014 ◽
Vol 53
(6)
◽
pp. 1791-1806
◽
2015 ◽
Vol 170
◽
pp. 258-267
◽
Keyword(s):
Keyword(s):
2018 ◽
Vol 51
(9)
◽
pp. 1529-1546
◽
Keyword(s):
2012 ◽
Vol 8
(1)
◽
Keyword(s):