scholarly journals An adaptive large neighbourhood search for the operational integrated production and distribution problem of perishable products

2015 ◽  
Vol 53 (20) ◽  
pp. 6040-6058 ◽  
Author(s):  
M.A.F. Belo-Filho ◽  
P. Amorim ◽  
B. Almada-Lobo
Mathematics ◽  
2020 ◽  
Vol 8 (2) ◽  
pp. 146 ◽  
Author(s):  
Ling Liu ◽  
Sen Liu

In this paper, an integrated production and distribution problem for perishable products is presented, which is an NP hard problem where a single machine, multi-customers, and homogenous vehicles with capacity constraints are considered. The objective is to minimize the total order weighted delivery time to measure the customer service level, by making two interacted decisions, production scheduling and vehicle routing, simultaneously. An integrated mathematical model is built, and the validity is measured by the linear programming software CPLEX by solving the small-size instances. An improved large neighborhood search algorithm is designed to address the problem. Firstly, a two-stage algorithm is constructed to generate the initial solution, which determines the order production sequence according to the given vehicle routing. Secondly, several removal/insertion heuristics are applied to enlarge the search space of neighbor solutions. Then, a local search algorithm is designed to improve the neighbor solutions, which further generates more chances to find the optimal solution. For comparison purposes, a genetic algorithm developed in a related problem is employed to solve this problem. The computational results show that the proposed improved large neighborhood search algorithm can provide higher quality solutions than the genetic algorithm.


2019 ◽  
Vol 31 (4) ◽  
pp. 1051-1078 ◽  
Author(s):  
Lei He ◽  
Mathijs de Weerdt ◽  
Neil Yorke-Smith

AbstractIn intelligent manufacturing, it is important to schedule orders from customers efficiently. Make-to-order companies may have to reject or postpone orders when the production capacity does not meet the demand. Many such real-world scheduling problems are characterised by processing times being dependent on the start time (time dependency) or on the preceding orders (sequence dependency), and typically have an earliest and latest possible start time. We introduce and analyze four algorithmic ideas for this class of time/sequence-dependent over-subscribed scheduling problems with time windows: a novel hybridization of adaptive large neighbourhood search (ALNS) and tabu search (TS), a new randomization strategy for neighbourhood operators, a partial sequence dominance heuristic, and a fast insertion strategy. Through factor analysis, we demonstrate the performance of these new algorithmic features on problem domains with varying properties. Evaluation of the resulting general purpose algorithm on three domains—an order acceptance and scheduling problem, a real-world multi-orbit agile Earth observation satellite scheduling problem, and a time-dependent orienteering problem with time windows—shows that our hybrid algorithm robustly outperforms general algorithms including a mixed integer programming method, a constraint programming method, recent state-of-the-art problem-dependent meta-heuristic methods, and a two-stage hybridization of ALNS and TS.


Sign in / Sign up

Export Citation Format

Share Document