Batch-scheduling problems through the flowshop with both receiving and delivery just in time

1993 ◽  
Vol 31 (8) ◽  
pp. 1943-1955 ◽  
Author(s):  
A. HAKIM HALIM ◽  
H. OHTA
2018 ◽  
Vol 11 (3) ◽  
pp. 390 ◽  
Author(s):  
Basar Ogun ◽  
Çigdem Alabas-Uslu

Purpose: Today’s manufacturing facilities are challenged by highly customized products and just in time manufacturing and delivery of these products. In this study, a batch scheduling problem is addressed to provide on-time completion of customer orders in the environment of lean manufacturing. The problem is to optimize partitioning of product components into batches and scheduling of the resulting batches where each customer order is received as a set of products made of various components.Design/methodology/approach: Three different mathematical models for minimization of total earliness and tardiness of customer orders are developed to provide on-time completion of customer orders and also, to avoid from inventory of final products. The first model is a non-linear integer programming model while the second is a linearized version of the first. Finally, to solve larger sized instances of the problem, an alternative linear integer model is presented.Findings: Computational study using a suit set of test instances showed that the alternative linear integer model is able to solve all test instances in varying sizes within quite shorter computer times comparing to the other two models. It was also showed that the alternative model can solve moderate sized real-world problems.Originality/value: The problem under study differentiates from existing batch scheduling problems in the literature since it includes new circumstances which may arise in real-world applications. This research, also, contributes the literature of batch scheduling problem by presenting new optimization models.


2002 ◽  
pp. 119-145
Author(s):  
Vincent T’kindt ◽  
Jean-Charles Billaut

2015 ◽  
Vol 2015 ◽  
pp. 1-12 ◽  
Author(s):  
Sivashan Chetty ◽  
Aderemi O. Adewumi

The Just-In-Time (JIT) scheduling problem is an important subject of study. It essentially constitutes the problem of scheduling critical business resources in an attempt to optimize given business objectives. This problem is NP-Hard in nature, hence requiring efficient solution techniques. To solve the JIT scheduling problem presented in this study, a new local search metaheuristic algorithm, namely, the enhanced Best Performance Algorithm (eBPA), is introduced. This is part of the initial study of the algorithm for scheduling problems. The current problem setting is the allocation of a large number of jobs required to be scheduled on multiple and identical machines which run in parallel. The due date of a job is characterized by a window frame of time, rather than a specific point in time. The performance of the eBPA is compared against Tabu Search (TS) and Simulated Annealing (SA). SA and TS are well-known local search metaheuristic algorithms. The results show the potential of the eBPA as a metaheuristic algorithm.


Mathematics ◽  
2020 ◽  
Vol 8 (1) ◽  
pp. 80
Author(s):  
Gilseung Ahn ◽  
Sun Hur

In this study, a batch scheduling with job grouping and batch sequencing is considered. A clustering algorithm and dispatching rule selection model is developed to minimize total tardiness. The model and algorithm are based on the constrained k-means algorithm and neural network. We also develop a method to generate a training dataset from historical data to train the neural network. We use numerical examples to demonstrate that the proposed algorithm and model efficiently and effectively solve batch scheduling problems.


Sign in / Sign up

Export Citation Format

Share Document