Auction-based transportation procurement in make-to-order systems

2015 ◽  
Vol 47 (11) ◽  
pp. 1236-1251 ◽  
Author(s):  
Su Xiu Xu ◽  
George Q. Huang
2014 ◽  
Vol 2014 ◽  
pp. 1-7 ◽  
Author(s):  
Mengqi Liu ◽  
Miyuan Shan ◽  
Juan Wu

For most enterprises, in order to win the initiative in the fierce competition of market, a key step is to improve their R&D ability to meet the various demands of customers more timely and less costly. This paper discusses the features of multiple R&D environments in large make-to-order enterprises under constrained human resource and budget, and puts forward a multi-project scheduling model during a certain period. Furthermore, we make some improvements to existed particle swarm algorithm and apply the one developed here to the resource-constrained multi-project scheduling model for a simulation experiment. Simultaneously, the feasibility of model and the validity of algorithm are proved in the experiment.


OR Spectrum ◽  
1998 ◽  
Vol 20 (2) ◽  
pp. 73-81 ◽  
Author(s):  
Ivo J. B. F. Adan ◽  
Jan van der Wal
Keyword(s):  

2009 ◽  
Vol 410-411 ◽  
pp. 151-158 ◽  
Author(s):  
Dominik T. Matt

Build-to-order was once the only way in which products were made, but limited the market to only the rich buyers. Mass production contributed to a wider access to products, however with losses in individuality. Finally, mass customization aimed at holding out the promise of both, and “lean” concepts helped to (partly) make it a reality. However, the world has changed significantly since the first introduction of “lean” – especially in the most recent years. European companies are facing a growing international competition in volume markets due to the increasing economical and technical emancipation of low labour cost countries. While multinational enterprises are shifting their manufacturing activities to Far East to keep competitive in terms of costs, small and medium sized companies often have to leave their traditional market segments and retreat into niches. However, smaller production lot sizes and the increasing complexity of product programmes require innovative manufacturing strategies. According to several studies and empirical proves, less than 0,5% of a company’s production lead time is value adding, the bigger part of it is dedicated to waiting, handling and internal transport. This paper presents a new approach for the design of lean manufacturing support systems in make-to-order production systems that have to deal with a huge variety of product types and with high variations in demand. A special focus is given to the design of manual material handling and transport (MMHT) solutions. With the help of axiomatic design principles, a tree of design parameters is derived and translated into generally applicable design rules. With the help of a practical example from make-to-order industry, the validity of the methodology is illustrated.


Sign in / Sign up

Export Citation Format

Share Document