Risk Communication and the Waste-to-energy Incinerator Environmental Impact Assessment Process: A UK Case Study of Public Involvement

2002 ◽  
Vol 45 (2) ◽  
pp. 267-283 ◽  
Author(s):  
Christopher Snary
1999 ◽  
Vol 39 (2) ◽  
pp. 119
Author(s):  
K.N. Davie ◽  
T.A. Winters

This paper discusses the relationship between the Aboriginal heritage clearance process and the environmental impact assessment process. The current Western Australian legislation and the Murrin Murrin nickel project and other Western Australian projects are used as a case study, although similar methods and issues are applicable to most states within Australia. The paper investigates areas where delays may occur and proposes a model which can be implemented to maximise the level of certainty for a project.


Author(s):  
Peter Salzer ◽  
Eva Sencˇa´kova´

Environmental Impact Assessment Act has been in force in the Slovak Republic since 1994. Evaluation of potential environmental impact of nuclear facilities/activities was enforced in the cases of newly sited constructions containing nuclear facilities much earlier: the civil construction legislation required the preparation of initial safety report with the same purposes. The cardinal change constituted by the EIA Act was the legal requirement of the public involvement in the assessment process, such as participation of municipalities, civil initiatives or public hearings. Another aspect was the most complex evaluation of impact, i.e. not only inside the nuclear safety framework but including, for instance, also non-nuclear, social, and economical aspects. All nuclear activities judged by the environmental impact assessment processes in the last eight years have been related to radioactive waste and spent fuel management facilities or activities and to the decommissioning of nuclear power plants. The particular cases are briefly described and the positive and negative implications from particular environmental impact assessment processes are discussed and generalized. Special attention is given to the use of EIA approaches in the strategy decision-making processes on various levels. There are the main difficulties and drawbacks in application of the EIA legal provisions in Slovakia at the present time.


2021 ◽  
Vol 23 (4) ◽  
pp. 1295-1310
Author(s):  
Burçin Atılgan Türkmen ◽  
Tuba Budak Duhbacı ◽  
Şeyma Karahan Özbilen