hydropower station
Recently Published Documents


TOTAL DOCUMENTS

893
(FIVE YEARS 268)

H-INDEX

26
(FIVE YEARS 8)

2022 ◽  
Vol 904 ◽  
pp. 35-41
Author(s):  
Hua Zhou ◽  
Jian Xin Ding ◽  
Zhi Cheng Zhang ◽  
Zhan Jun Wang

The water temperature distribution and spatio-temporal variation law of the reservoir have a great influence on the water quality and ecological environment of the reservoir, and it is also an important temperature boundary condition for the design of concrete dam of hydropower station project, which is of great significance for the optimal design and operation of the reservoir. There are many factors affecting the water temperature of the reservoir, and it is difficult to predict the water temperature distribution accurately because of the lack of data and experience. In this paper, a numerical analysis model is established for the reservoir of a hydropower station on the Nam Ngum in Laos, and the water temperature of the reservoir is calculated and predicted, and the water temperature distribution in the reservoir and the water temperature distribution in front of the dam are analyzed and discussed. The results show that the solar shortwave radiation is the main factor affecting the temperature stratification of the reservoir. The stable low temperature layer of the reservoir is not obvious, but there is a tendency to form stratification. The research results can provide water temperature value for the design of concrete dam of the hydropower station and provide reference for the prediction of the water temperature of other similar reservoirs.


2022 ◽  
Vol 14 (1) ◽  
pp. 1-12
Author(s):  
Senlin Yang ◽  
Hongyi Cao ◽  
Yi Zhang ◽  
Lei Chen ◽  
Xinji Xu ◽  
...  

Abstract Seismic method is a major approach for detecting the seismic geological features ahead of the tunnel, understanding the distribution of unfavorable geology, and ensuring the safety of tunnel construction. Observation system is the key for seismic detection, many studies have been conducted to optimize the observation system; however, most of them focused on the surface seismic investigation and numerical simulation rather than in tunnel field environment (limited aperture and full space environment). How to obtain better wavefield information with limited observation aperture is a great challenge. In this study numerical simulation and instrumental techniques (GPR, DC, etc.) were implemented to further check the result of seismic detection at the 1# tailrace tunnel at the Wudongde hydropower station. In the field case, observation detectors were arranged spatially in the tunnel and source points were placed in four ways: linearly along a single side, on the tunnel face, in front of the detectors, and behind the detectors. Then, after data acquisition, the data processing is conducted to carry out the migration results. The imaging results indicate that the observation system with sources and detectors in liner arrangement (with equal interval) helps to suppress artifacts, further supporting the advantages of spatial observation system with liner observation line (detectors). Moreover, the study provides suggestions for geological prospecting in similar tunnel projects.


2021 ◽  
Vol 2021 ◽  
pp. 1-11
Author(s):  
Hao Zhang ◽  
Zaiqiang Hu ◽  
Xingzhou Chen ◽  
Hongru Li

The existing research data show that, after reservoir impoundment, due to the repeated rise and fall of water level and water-rock interaction, the mechanical parameters of landslide are reduced, which will have an adverse effect on the stability of landslide. Therefore, sufficient attention must be paid to the stability of slope after reservoir impoundment. Hejia landslide is the largest landslide near the bank of Miaojiaba hydropower station, and its stability plays an important role in the normal operation of the hydropower station. Through field investigation and analysis of regional geological conditions, it is concluded that Hejia landslide is a large-scale landslide, through long-term sliding-bending deformation; it is generated from the external hard rock with thick layers and sliding zone for layered soft rock; the formation mechanism of landslide is as follows: (1) high-steep and hard-soft layered slope is the slope structure condition that caused the large landslide; (2) the existence of thick soft rock belt provides material conditions for the formation of slip surface; (3) certain air conditions provide displacement space for the separation and disintegration of the sliding body, and the landslide is stable at present. Numerical analysis results show that reservoir impoundment will adversely affect the stability of landslide. In order to ensure the normal operation of power station, certain engineering measures must be taken to treat Hejia landslide. After taking measures, years of monitoring data show that the deformation of Hejia landslide tends to be stable, and the current operation is normal, indicating that the engineering treatment measures are reasonable and feasible.


2021 ◽  
Vol 14 (1) ◽  
pp. 194
Author(s):  
Liwen Liu ◽  
Yaling Zhang ◽  
Lu Zhao ◽  
Cun Zhan ◽  
Chuan Liang

Huge amounts of energy and resources will be consumed, and a large quantity of environmental pollutants will be produced during the construction process of large-scale hydropower projects. As a core link of green supply chain in hydropower projects, green construction is particularly critical. To objectively evaluate the green construction level of large-scale hydropower projects, an evaluation indicator system was constructed in the study. The evaluation system consisted of 30 quantitative indicators and 7 qualitative indicators from the perspectives of environmental protection, resource saving and comprehensive management on the basis of the construction characteristics of large-scale hydropower projects. The quantitative and qualitative evaluation standards were proposed by combining with relevant laws and regulations, specifications and standards, and the environmental management maturity model. Furthermore, taking the second quarter of 2018 in Wudongde Hydropower Station on the Jinsha River, China, as an example, green construction level was assessed by the analytic hierarchy process fuzzy comprehensive evaluation (AHP-FCE) method. The calculation results indicated that the evaluation value of green construction in Wudongde Hydropower Station was 3.697, at “Good” level. The evaluation values of environmental protection, resource saving, and comprehensive management were 3.681, 3.473, and 3.965, respectively, within the range of 3 to 4, so they were all evaluated to be “Good”. To further improve the green construction level, it was necessary to supervise some aspects of construction process, i.e., treatment of waste slag in construction, economical and intensive utilization of land, publicity and training, soil erosion control, and saving water resources. In particular, management of soil erosion control should be strengthened. The proposed green construction evaluation system is relatively reliable and practical for professionals in the green hydropower industry, and can provide a reference for other large-scale hydropower projects.


2021 ◽  
Vol 2021 ◽  
pp. 1-12
Author(s):  
Lulu Wang ◽  
Hanmei Peng ◽  
Mao Tan ◽  
Rui Pan

The inflow forecasting is one of the most important technologies for modern hydropower station. Under the joint influence of soil, upstream inflow, and precipitation, the inflow is often characterized by time lag, nonlinearity, and uncertainty and then results in the difficulty of accurate multistep prediction of inflow. To address the coupling relationship between inflow and the related factors, this paper proposes a long short-term memory deep learning model based on the Bagging algorithm (Bagging-LSTM) to predict the inflows of future 3 h, 12 h, and 24 h, respectively. To validate the proposed model, the inflow and related weather data come from a hydropower station in southern China. Compared with the classical time series models, the results show that the proposed model outperforms them on different accuracy metrics, especially in the scenario of multistep prediction.


Sign in / Sign up

Export Citation Format

Share Document