scholarly journals Scheduling of preventive maintenance of an power equipment of the agricultural enterprises

2021 ◽  
Vol 1781 (1) ◽  
pp. 012018
Author(s):  
I Trunova ◽  
O Miroshnik ◽  
O Savchenko ◽  
O Moroz ◽  
V Pazyi ◽  
...  
2021 ◽  
Vol 23 (1) ◽  
pp. 61-64
Author(s):  
Srbislav Sarić ◽  
Biljana Sarić

In the distribution area of Novi Sad, owned by ODS EPS Distribucija, there are 35 substations 35/10kV that are on average over 50 years old. Considering the tendency to gradually eliminate the voltage levels of 35kV and 10kV in this distribution area and the transition to the voltage level of 20kV, some of these substations are planned for reconstruction into 20kV distribution plants. Reconstruction of these substations requires large financial resources, because their construction part is in a very bad condition, electric power equipment is unreliable and difficult to maintain, and operational readiness is an increasingly important factor in presenting successful business. During the reconstruction of these transformer stations, the possibility of a backup power supply route for electricity customers, the speed of intervention and the smooth performance of preventive maintenance must be taken into account. The appearance of reclosers opened a new chapter in the world of electricity. Namely, now the above problems and requirements can be solved in a simpler and cheaper way with the use of reclosers. The paper will present a proposal for the reconstruction of the substaion 35/10 kV "Kuzmin" in the area of the Branch Distribution Sremska Mitrovica, which has been operating for more than 60 years, in an external 20 kV distribution plant formed with the help of reclosers built on steel lattice poles. The proposed solution can be used to solve the same or similar problems, primarily in the distribution area of Novi Sad.


2012 ◽  
Vol 605-607 ◽  
pp. 296-299
Author(s):  
Yan Li ◽  
Yu Mei Hu ◽  
Yun Feng Luo ◽  
Chang Chen Liu

The maintenance strategy is a tradeoff between cost and reliability. In this paper we consider the maintenance plan from the view of economic life cycle cost and reliability. We discuss the maintenance interval optimization on the premise that the preventive maintenance mitigates failure rate level and intensifies failure variance ratio meanwhile. The specific effect of this kind of preventive maintenance on failure rate and its variance ratio is explored, and then we construct a life cycle cost model of electric power equipment and propose the annuity of life cycle cost minimization as a method for seeking an optimal maintenance interval solution.


2009 ◽  
Vol 129 (1) ◽  
pp. 165-172
Author(s):  
Hiroyuki Shinkai ◽  
Hisashi Goshima ◽  
Masafumi Yashima

2008 ◽  
Vol 128 (7) ◽  
pp. 961-966 ◽  
Author(s):  
Junichi Toyoda ◽  
Kunio Sakamoto ◽  
Takuji Chida

2018 ◽  
Vol 138 (11) ◽  
pp. 914-922
Author(s):  
Masashi Kotari ◽  
Tomo Tadokoro ◽  
Shin-ichi Tanaka ◽  
Mikimasa Iwata

Sign in / Sign up

Export Citation Format

Share Document