scholarly journals Research on the Selection and Optimization of Horizontal Swirling Energy Dissipation Flood Discharge Tunnel

2021 ◽  
Vol 638 (1) ◽  
pp. 012063
Author(s):  
Ying Zhang ◽  
Shengjie Di ◽  
Heng Zhou
2019 ◽  
Author(s):  
Deliang Shi ◽  
Dong Liu ◽  
Hui Chen ◽  
Dongmei Hou ◽  
Zhixin Wang

2017 ◽  
pp. 24-32
Author(s):  
Mingxiao Liu ◽  
Guodong Li ◽  
Michele Guala ◽  
Dongpo Sun

2012 ◽  
Vol 212-213 ◽  
pp. 1048-1056
Author(s):  
Jing Li ◽  
Bo Le Jiang

Normally, it is much complicated and difficult to design flood discharge and energy dissipation with large discharge. In this paper, twelve designed schemes of a curtain hydropower station were compared and analyzed repeatedly. It provides better reference scheme for engineering design. On weir surface and middle orifice local hydraulic model with geometry scale of 1:60, the writer tested and researched on energy dissipation capacity ,velocity and flow pattern, pressure distribution and related hydraulics problems of the curtain hydropower station discharging structure layout. Basically practicable discharging structure pattern and stilling pool pattern were put forward, through comparison and optimization of more than ten schemes. The study result showed that the surface orifice adapting proper pattern of flaring gate pier was favorable to increase the energy dissipation efficiency and shorten the length of stilling pool, but had no effect on the phenomenon of water wing hitting both sides of guide wall caused by flaring gate pier, the schemes of canceling flaring gate pier of surface orifice and adapting the declined pattern stilling pool could decrease the stilling pool floor plate velocity of under flow energy dissipation efficiently ,at the same time diminish the phenomenon of water wing hitting guide wall on both sides caused by flaring gate pier and obtain certain satisfying energy dissipation effect, moreover it had much heuristic and inspirational effect on similar projects.


2021 ◽  
Vol 248 ◽  
pp. 03066
Author(s):  
Fang Jie ◽  
Cao Chunjian ◽  
Li Shengbing

Dam is set in large hydropower station. Cushion pool is built behind the dam for the flood discharge and energy dissipation of the reservoir. Operation of flood discharge and energy dissipation for some time, Cushion pool is dewatering and structure safety of which is study, then cushion pool is filled. Temporary dewater and filled system is used by previous engineer, but is arranged and controlled hard. Based on need of the cushion pool dewatering and filling, for an example of Baihetan hydropower station, necessity and feasibility are study. Then a permanent dewatering and filling system is designed for cushion pool. Design principle and arrange method are described. Many technical difficulties are study and resolved such as effect of valley deformation on the control system of dewatering and filling, demand of dewatering and filling device parameter, performance quota formulate based on large water level amplitude, protective measures in the working condition of much silt on the downstream and humidity in the equipment room of the second-dam and project of dewater drainage outlet under the water. By gravity drainage and filling based on water level difference and pump drainage, much electric energy is saved and personnel operating environment and working conditions are improved.


2013 ◽  
Vol 51 ◽  
pp. 1-11 ◽  
Author(s):  
Tao Wang ◽  
Hegao Wu ◽  
Yang Li ◽  
Huizhong Gui ◽  
Yong Zhou ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document