Research on Probabilistic Power Flow of the Distribution System Based on Cornish-Fisher

Author(s):  
Gui-kun Tang ◽  
Shu-jun Yao ◽  
Yan Wang
Energies ◽  
2021 ◽  
Vol 14 (13) ◽  
pp. 3843
Author(s):  
Sultan Sh. Alanzi ◽  
Rashad M. Kamel

This paper investigates the maximum photovoltaic (PV) penetration limits on both overhead lines and underground cables medium voltage radial distribution system. The maximum PV penetration limit is estimated considering both bus voltage limit (1.05 p.u.) and feeder current ampacity (1 p.u.). All factors affect the max PV penetration limit are investigated in detail. Substation voltage, load percentage, load power factor, and power system frequency (50 Hz or 60 Hz) are analyzed. The maximum PV penetration limit associated with overhead lines is usually higher than the value associated with the underground cables for high substation voltage (substation voltage = 1.05 and 1.04 p.u.). The maximum PV penetration limit decreases dramatically with low load percentage for both feeder types but still the overhead lines accept PV plant higher than the underground cables. Conversely, the maximum PV penetration increases with load power factor decreasing and the overhead lines capability for hosting PV plant remains higher than the capability of the underground cables. This paper proved that the capability of the 60-Hz power system for hosting the PV plant is higher than the capability of 50 Hz power system. MATLAB software has been employed to obtain all results in this paper. The Newton-Raphson iterative method was the used method to solve the power flow of the investigated systems.


2012 ◽  
Vol 433-440 ◽  
pp. 7190-7194 ◽  
Author(s):  
Nattachote Rugthaicharoencheep ◽  
Thong Lantharthong ◽  
Awiruth Ratreepruk ◽  
Jenwit Ratchatha

This paper presents the optimal and sizing of distributed generation (DG) placement in a radial distribution system for loss reduction. The main emphasis of this paper is to identify proper locations for installing DGs in a distribution system to reduce active power loss and improve bus voltages. Nevertheless, proper placement and sizing of DG units are not straightforward to be identified as a number of their positions and capacities need to be determined. It is therefore proposed in this paper to solve a DG placement problem based on a Tabu search algorithm. The objective function of the problem is to minimize the system loss subject to power flow constraints, bus voltage limits, pre specified number of DGs, and their allowable total installed capacity, and only one distributed generator for one installation position. The effectiveness of the methodology is demonstrated by a practical sized distribution system consisting of 69 bus and 48 load points. The results show that the optimal DG placement and sizing can be identified to give the minimum power loss while respecting all the constraints.